ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2020, Vol. 40 ›› Issue (11): 1570-1577.DOI: 10.3973/j.issn.2096-4498.2020.11.004

Previous Articles     Next Articles

Research on Upgrading of TBM Boring Modal Experiment Platform

YANG Yandong1, 2, SUN Zhenchuan1, 2, *, LI Fengyuan1, 2, ZHANG Bing1, 2, XU Huaguo1, 2   

  1. (1. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)
  • Online:2020-11-20 Published:2020-12-09

Abstract: The load distribution laws of disc cutter on different positions of cutterhead of fullface rock tunnel boring(TBM) machine are of great significance to preventing the TBM disc cutter and cutter seat from frequent overload failure. First, by upgrading the TBM boring modal experiment platform, the load monitoring system is developed for single disc cutter, and the direct acquisition of disc cutters with different types such as singleedged, center doubleedged, etc. is realized. Second, the disc cutter load and rotation speed monitoring system is developed to realize realtime acquisition and wireless transmission of disc cutter load and rotation speed data. Third, a multifunctional cutterhead with adjustable disc cutter with different specifications, adjustable cutter spacing and height differences has been manufactured, which realizes the arrangement of disc cutter in various ways. The upgrading of TBM boring modal experiment platform can provide experimental tools for the theoretical rock breaking study of load distribution laws of disc cutter and arrangement of TBM cuterhead and cutter, and as well provide a new method for realtime monitoring of TBM disc cutter loads.

Key words: experiment platform upgrade, cutterhead and cutters, load test, rotation speed monitoring, TBM boring modal experiment platform

CLC Number: