Tunnel Construction ›› 2020, Vol. 40 ›› Issue (11): 1673-1681.DOI: 10.3973/j.issn.2096-4498.2020.11.017

Previous Articles     Next Articles

Design and Practice of TBM Intelligent Driving System of Key Parameters

XU Jian′an1, LI Jianbin2, JING Liujie1, 3, XU Shoutian1, YOU Yusong1   

  1. (1. China Railway Engineering Equipment Group Co. , Ltd., Zhengzhou 450016, Henan, China; 2. China Railway HiTech Industry Co., Ltd., Beijing 100000, China; 3. State Key Laboratory for Geomechanics & Deep Underground Engineering, CUMT, Xuzhou 221116, Jiangsu, China)
  • Online:2020-11-20 Published:2020-12-09

Abstract: At present, the TBM intelligent control system is basically customized with strong coupling, which may cause many code problems such as high redundancy, low reuse rate and high design threshold. In order to solve these problems, the technology framework for TBM intelligent driving system of key parameters is designed. The develop threshold is minimized via the mode of low code or no code, and the lower coupling for the system is realized via model development. On this basis, the algorithm models from different algorithm developers are integrated in the way that the algorithm model and system software belong to different services, so as to realize the rapid integration of system software and algorithm model, which is used for the prediction and control of key parameters in the TBM intelligent tunneling process. The applicable effect of the system software in the TBM construction of Songhua River water diversion project is good, which is of great significance to the efficiency improvement of TBM excavation.

Key words: TBM, key parameters, intelligent driving, plugin; algorithm integration