[1] |
ZHAO Hailei, SUN Zhenchuan, ZHANG Bing, WANG Yafeng, YANG Yandong, QIN Yinping, LI Hongbo.
Research on Correlation of Key Parameters of TBM Cutter
Head Based on Improved CSM Model
[J]. Tunnel Construction, 2020, 40(S1): 169-178.
|
[2] |
SUN Zhenchuan, YANG Yandong, LI Fengyuan, ZHANG Bing.
Research on TBM Rock Breaking Characteristic Parameters
Based on Tunnel Projects
[J]. Tunnel Construction, 2020, 40(S1): 25-30.
|
[3] |
WANG Xulong, ZHU Ye.
Coupled Vibration Analysis of Fullface
TBM Main Body Based on ADAMS
[J]. Tunnel Construction, 2020, 40(9): 1300-1306.
|
[4] |
YANG Dongjian, ZHUO Puzhou, GUO Zhenggang, MENG Zhichao, BAI Liang, HUO Junzhou.
Design and Experimental Research of TBM Integrated
Cutter System
Based on Robot Operation
[J]. Tunnel Construction, 2020, 40(8): 1236-1242.
|
[5] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[6] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[7] |
SUN Haibo.
Key Technology of Main Drive Assembly and Inspection
Technology of Meshing Quality of Gear Pair during TBM Remanufacturing
[J]. Tunnel Construction, 2020, 40(6): 890-897.
|
[8] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[9] |
WANG Mingyou, HOU Shaokang, LIU Yaoru, JIN Feng.
Influence of Backfill Grouting Compactness of TBM Pea-gravel on Supporting Effect
[J]. Tunnel Construction, 2020, 40(3): 326-336.
|
[10] |
DUAN Zhiwei, DU Lijie, LYU Haiming, WANG Jiahai, LIU Haidong, FU Yongming.
Real-time Identification Method of TBM Surrounding Rock Excavatability
Grade Based on Principal Component Analysis and BP Neural Network
[J]. Tunnel Construction, 2020, 40(3): 379-388.
|
[11] |
ZHU Pengjin, ZHAO Kanglin, XIAO Lixing.
Development and Application of Equipment for Lateral
Moving and Advancing without Load of TBM
[J]. Tunnel Construction, 2020, 40(3): 417-425.
|
[12] |
YANG Yandong, SUN Zhenchuan, LI Fengyuan, ZHANG Bing, XU Huaguo.
Research on Upgrading of TBM Boring Modal Experiment Platform
[J]. Tunnel Construction, 2020, 40(11): 1570-1577.
|
[13] |
HAN Xiaoliang.
Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing
[J]. Tunnel Construction, 2019, 39(S2): 393-397.
|
[14] |
WANG Xu, MENG Lu, CHENG Desheng, LU Song.
Research and Application of Comprehensive Geophysical Methods for Quality Testing of Backfill Grouting behind Lining Segment of TBM Construction Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 166-175.
|
[15] |
ZHANG Binrong, GUAN Huisheng, ZHAO Changsheng, WANG Mo.
Finite Element Simulation Analysis of Rock Breaking Test Platform for Dualmode TBM Cutter
[J]. Tunnel Construction, 2019, 39(S1): 290-295.
|