[1] |
LI Fengyuan, ZENG Chuigang.
Development Status and Trend of Intelligent
Manufacturing Operation and Maintenance for Full-Face Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(S1): 6-13.
|
[2] |
CHEN Xiangsheng, WANG Lei, YANG Wensheng, SU Dong, WU Yongzhao, LIU Shuya.
Construction Scheme and Mechanical Properties of a
Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
[J]. Tunnel Construction, 2023, 43(7): 1089-1098.
|
[3] |
LIU Zaizheng, KE Wei, YAO Man, JI Zhiyong, WEN Zhongbao, YANG Xu.
Structural Design and Application of Cutterhead for
Graded Excavation of FullFace
Vertical Shaft Boring Machine with SuperLarge Diameter
[J]. Tunnel Construction, 2023, 43(6): 1057-1064.
|
[4] |
CHEN Ruixiang, ZENG Chuigang, LI Fengyuan, HAN Weifeng, HU Xinpeng, WANG Yuxiang.
Design and Application of a Prefabricated Component
Installation Machine for Shield Tunnel Internal Structures
[J]. Tunnel Construction, 2023, 43(3): 505-513.
|
[5] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
[6] |
BAO Heli, JIANG Hong.
Structural Design of Prefabricated Concrete Segment
for Assembled Shaft
[J]. Tunnel Construction, 2022, 42(S1): 376-381.
|
[7] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
[8] |
OUYANG Xiaoyong, XIAN Jianping, ZHU Li, SHAN Hongwei, WANG Gangfeng.
Research and Application of Construction Technology of
LongSection and LargeTonnage Prefabricated Utility
Tunnels: a
Case Study of Xiong′an New Area, China
[J]. Tunnel Construction, 2022, 42(8): 1473-1481.
|
[9] |
YU Beijun, LIU Yonggang, ZHANG Zhihe.
Construction Technology of a HeavyDuty
Lining Trolley with Pushing Sliding Buckle Support
for a Giant Underground Cavern
[J]. Tunnel Construction, 2022, 42(7): 1308-1317.
|
[10] |
SHI Changhong, LING Songyao, CAO Yanfu, GUO Kai, WANG Gangfeng.
Design and Application of Hydraulic Formwork for LongSection
and LargeTonnage
Prefabricated Utility Tunnel
[J]. Tunnel Construction, 2022, 42(6): 1071-1076.
|
[11] |
ZHANG Yazhou, YAO Zhanhu, WEI Chi, ZHANG Xiying, ZHAO Xiaopeng, WU Ronghua, CHENG Xiaoqing.
Discussion on Main Issues of Shield Tunnel
Waterproofing Technology and Its Future Prospect
[J]. Tunnel Construction, 2022, 42(11): 1832-1843.
|
[12] |
KONG Deshun, LI Quan, GAO Xiangsheng.
Optimum Design for Transport and Adjustment Integrated
Machine for LargeDiameter Lined Steel Tile in
Tunnels
[J]. Tunnel Construction, 2022, 42(11): 1956-1962.
|
[13] |
LIU Jianyou, LYU Gang, ZHAO Yong, YUE Ling.
Environmental Protection Techniques for New Badaling
Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area
[J]. Tunnel Construction, 2021, 41(8): 1361-.
|
[14] |
YUAN Xiaowei, ZHUO Xingjian, JIANG Lijie, SUN Yanming, YANG Hang.
A New Type of Robotic Structure and Its Trajectory
Planning-Method for Tunnel Boring Machine Muck Removal
[J]. Tunnel Construction, 2021, 41(8): 1422-.
|
[15] |
ZHANG Zhonghua, ZHENG Jun, REN Yang, HE Bo.
Optimization of Main Drive Seals in Shields
[J]. Tunnel Construction, 2021, 41(6): 1065-1070.
|