Tunnel Construction ›› 2020, Vol. 40 ›› Issue (S1): 396-403.DOI: 10.3973/j.issn.2096-4498.2020.S1.052
Previous Articles Next Articles
YAO Yinbin
Online:
Published:
Abstract: In order to solve the problems of receiving largediameter slurry shield in strong permeable sand pebble stratum with shallow overburden, based on large diameter slurry shield tunnel of Yuanjiang in Changde City, dry receiving construction technology is proposed. The stability of the whole structure in end reinforcement area is improved and the conditions for shield acceptance are satisfied by using the joint reinforcement methods of RJP superhigh pressure jet grouting, vertical freezing and plastic concrete diaphragm wall in the end reinforcement area. In the process of shield dry receiving, by controlling various construction parameters and grasping the key points of construction timing accurately, shield machine smoothly passes through the existing pipeline and reinforcement area, and the maximum settlement of the pipeline and the surface is controlled within 6 mm and 5 mm respectively so as to ensure the accurate exit of the shield machine. In addition, portal brushes are installed in the steel ring of the portal to prevent soil loss when shield machine exits the tunnel. Meanwhile, synchronous grouting volume is increased and segments are connected and fixed with channel steel to ensure shield tail and support safety during the process of shield machine leaving the tunnel.
Key words: shallow overburden soil, strong permeable sand pebble stratum, large diameter shield, dry receiving, slurry shield, control of tunneling parameters, end reinforcement
CLC Number:
U 45
YAO Yinbin. Construction Technology of Large Diameter Slurry Shield in Strong Permeable Sand Pebble Stratum with Shallow Overburden Soil[J]. Tunnel Construction, 2020, 40(S1): 396-403.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.S1.052
http://www.suidaojs.com/EN/Y2020/V40/IS1/396
Slag Discharge Characteristics of Slurry Shield Circulatory Pipe in Cobble Stratum
Construction Technology of Integral Translation and UTurn of Large Diameter Shield in Narrow Space: a Case Study of Kanaphuli Tunnel in Bangladesh
Type Selection of SuperLargeDiameter Slurry Shield Tunneling through Various Typical Strata: a Case Study of Wuhu Yangtze River Tunnel
Test and Application Study on Dispersion and Disintegration of Mud Cake on Slurry Shield
SuperLarge Diameter Shield Tunneling Method in Extremely Soft and Hard Composite Strata: a Case Study of Shantou Bay Tunnel
Numerical Analysis of Face Stability of LargeDiameter Slurry Shield Used in Mawan Subsea Tunnel in Complex Strata
Receiving Technology of Multiple Shields in Oblique Cross Passage under Complex Conditions