| [1] | 
													
														LI Fangyi, ZHANG Xiaoping, XU Dan, JIANG Jun, ZHOU Zhi, SHEN Jie, WANG Haojie, ZHANG Xinyue. 
														
															 
	Prediction of Surface Deformation of a Shield Tunnel
Using Air Pressure Assisted Tunneling
Based on Support Vector Machine
														 [J]. Tunnel Construction, 2021, 41(7): 1159-1165.
													 | 
												
																																																																																
													| [2] | 
													
														LI Aimin, LI Hong′an, LI Bin. 
														
															 
	A Design Scheme for Lateral Launching of a Double Track
Shield Tunnel
Using a Mined Single Channel with a Composite Structure
														 [J]. Tunnel Construction, 2021, 41(7): 1188-1196.
													 | 
												
																																																																																
													| [3] | 
													
														SUN Huiliang, HU Shengbin, XIAO Pengfei, HU Min. 
														
															 
	
	
		Construction Risk Control of a Metro Shield Tunnel in
a Curved Receiving Section Obliquely Crossing an Adjacent
Existing Station: a Case Study on Nanning Rail Transit Line 5 Crossing
underneath Guangxi
University Station on Existing Line 1 
	
 
														 [J]. Tunnel Construction, 2021, 41(7): 1206-1217.
													 | 
												
																																																																																
													| [4] | 
													
														LIU Xian, SUN Qihao. 
														
															Characteristics Analysis on Progressive Collapse of
Shield Tunnel
														[J]. Tunnel Construction, 2021, 41(6): 913-922.
													 | 
												
																																																																																
													| [5] | 
													
														CHEN Dan, LIU Zhe, LIU Jianyou, FANG Qian, HAI Lu. 
														
															StateofArt and
Prospects for Intelligent Construction Technology for Railway
Shield Tunneling
														[J]. Tunnel Construction, 2021, 41(6): 923-932.
													 | 
												
																																																																																
													| [6] | 
													
														HE Yuan, YANG Zhenhua, LIU Xian, DING Wenqi. 
														
															 
	Theoretical Solution for Failure Mechanism of
Circumferential Joint of Shield
Tunnel Segment Connected Using Diagonal Bolts
														 [J]. Tunnel Construction, 2021, 41(6): 933-945.
													 | 
												
																																																																																
													| [7] | 
													
														XIA Runhe, QIAO Xiaoyan, WU Hongqun. 
														
															Causes and Prevention of Unsafe Behavior of Metro
Station Construction Workers
														[J]. Tunnel Construction, 2021, 41(6): 1024-1031.
													 | 
												
																																																																																
													| [8] | 
													
														NIU Bin. 
														
															 
	Replacement Technology of ConcreteFilled
Steel Tubular Columns in Method
Station Excavated by CutandCover
TopDown Method
														 [J]. Tunnel Construction, 2021, 41(6): 1032-1038.
													 | 
												
																																																																																
													| [9] | 
													
														WU Xianguo, LIU Xi, CHEN Hongyu, ZENG Tiemei, WANG Jinfeng, TAO Wentao. 
														
															 
	Preassessment of Safety Risk of Shield Tunneling
underneath Existing
Tunnel Based on Fuzzy Bayesian Networks and Evidence Theory
														 [J]. Tunnel Construction, 2021, 41(5): 713-720.
													 | 
												
																																																																																
													| [10] | 
													
														LAI Hongpeng, WANG Tengteng, ZHANG Linjie, YUAN Ye, LUO Wei. 
														
															Construction Control of Shield Tunneling underneath
Existing Metro Tunnel Considering Friction between Shield Shell and Soil
														[J]. Tunnel Construction, 2021, 41(5): 729-739.
													 | 
												
																																																																																
													| [11] | 
													
														LI Zengliang. 
														
															Combined Prediction Model for Shield Vertical Posture
Based on Deep Learning
														[J]. Tunnel Construction, 2021, 41(5): 758-763.
													 | 
												
																																																																																
													| [12] | 
													
														SU Liyong, LU Qingquan, ZHANG Zhiwei, XU Yang, REN Yuhong, ZHOU Yi. 
														
															Assembled Technology of Top Air Duct of a Metro
Station:a Case Study on Phase 1 Project of Beijing Metro Line No. 19
														[J]. Tunnel Construction, 2021, 41(5): 814-821.
													 | 
												
																																																																																
													| [13] | 
													
														ZHANG Jinwei, LUO Furong, TONG Lihong, YANG Binbin, XU Qian. 
														
															 
	Study on Prefabricated Lining Structure Design of a Metro
Tunnel Constructed
by Mining Method
														 [J]. Tunnel Construction, 2021, 41(5): 822-830.
													 | 
												
																																																																																
													| [14] | 
													
														HU Zhinan, MENG Xiangfei, LIU Zhichun, LIN Pan, WANG Xulin. 
														
															 
	InsertTube Freezing Method for Expanding
Construction of Metro Station Based
on DoubleLine Shield Tunnel and Its Mechanical Characteristics
														 [J]. Tunnel Construction, 2021, 41(4): 579-587.
													 | 
												
																																																																																
													| [15] | 
													
														CHEN Xiangyu, PAN Xi, DING Jianjun. 
														
															Study on Influence of Excess Pore Water Pressure on
Limit Support Pressure of Shield Tunnel
														[J]. Tunnel Construction, 2021, 41(4): 597-603.
													 |