[1] |
LI Fangyi, ZHANG Xiaoping, XU Dan, JIANG Jun, ZHOU Zhi, SHEN Jie, WANG Haojie, ZHANG Xinyue.
Prediction of Surface Deformation of a Shield Tunnel
Using Air Pressure Assisted Tunneling
Based on Support Vector Machine
[J]. Tunnel Construction, 2021, 41(7): 1159-1165.
|
[2] |
LI Aimin, LI Hong′an, LI Bin.
A Design Scheme for Lateral Launching of a Double Track
Shield Tunnel
Using a Mined Single Channel with a Composite Structure
[J]. Tunnel Construction, 2021, 41(7): 1188-1196.
|
[3] |
SUN Huiliang, HU Shengbin, XIAO Pengfei, HU Min.
Construction Risk Control of a Metro Shield Tunnel in
a Curved Receiving Section Obliquely Crossing an Adjacent
Existing Station: a Case Study on Nanning Rail Transit Line 5 Crossing
underneath Guangxi
University Station on Existing Line 1
[J]. Tunnel Construction, 2021, 41(7): 1206-1217.
|
[4] |
LIU Xian, SUN Qihao.
Characteristics Analysis on Progressive Collapse of
Shield Tunnel
[J]. Tunnel Construction, 2021, 41(6): 913-922.
|
[5] |
CHEN Dan, LIU Zhe, LIU Jianyou, FANG Qian, HAI Lu.
StateofArt and
Prospects for Intelligent Construction Technology for Railway
Shield Tunneling
[J]. Tunnel Construction, 2021, 41(6): 923-932.
|
[6] |
HE Yuan, YANG Zhenhua, LIU Xian, DING Wenqi.
Theoretical Solution for Failure Mechanism of
Circumferential Joint of Shield
Tunnel Segment Connected Using Diagonal Bolts
[J]. Tunnel Construction, 2021, 41(6): 933-945.
|
[7] |
XIA Runhe, QIAO Xiaoyan, WU Hongqun.
Causes and Prevention of Unsafe Behavior of Metro
Station Construction Workers
[J]. Tunnel Construction, 2021, 41(6): 1024-1031.
|
[8] |
NIU Bin.
Replacement Technology of ConcreteFilled
Steel Tubular Columns in Method
Station Excavated by CutandCover
TopDown Method
[J]. Tunnel Construction, 2021, 41(6): 1032-1038.
|
[9] |
WU Xianguo, LIU Xi, CHEN Hongyu, ZENG Tiemei, WANG Jinfeng, TAO Wentao.
Preassessment of Safety Risk of Shield Tunneling
underneath Existing
Tunnel Based on Fuzzy Bayesian Networks and Evidence Theory
[J]. Tunnel Construction, 2021, 41(5): 713-720.
|
[10] |
LAI Hongpeng, WANG Tengteng, ZHANG Linjie, YUAN Ye, LUO Wei.
Construction Control of Shield Tunneling underneath
Existing Metro Tunnel Considering Friction between Shield Shell and Soil
[J]. Tunnel Construction, 2021, 41(5): 729-739.
|
[11] |
LI Zengliang.
Combined Prediction Model for Shield Vertical Posture
Based on Deep Learning
[J]. Tunnel Construction, 2021, 41(5): 758-763.
|
[12] |
SU Liyong, LU Qingquan, ZHANG Zhiwei, XU Yang, REN Yuhong, ZHOU Yi.
Assembled Technology of Top Air Duct of a Metro
Station:a Case Study on Phase 1 Project of Beijing Metro Line No. 19
[J]. Tunnel Construction, 2021, 41(5): 814-821.
|
[13] |
ZHANG Jinwei, LUO Furong, TONG Lihong, YANG Binbin, XU Qian.
Study on Prefabricated Lining Structure Design of a Metro
Tunnel Constructed
by Mining Method
[J]. Tunnel Construction, 2021, 41(5): 822-830.
|
[14] |
HU Zhinan, MENG Xiangfei, LIU Zhichun, LIN Pan, WANG Xulin.
InsertTube Freezing Method for Expanding
Construction of Metro Station Based
on DoubleLine Shield Tunnel and Its Mechanical Characteristics
[J]. Tunnel Construction, 2021, 41(4): 579-587.
|
[15] |
CHEN Xiangyu, PAN Xi, DING Jianjun.
Study on Influence of Excess Pore Water Pressure on
Limit Support Pressure of Shield Tunnel
[J]. Tunnel Construction, 2021, 41(4): 597-603.
|