ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2020, Vol. 40 ›› Issue (S2): 319-324.DOI: 10.3973/j.issn.2096-4498.2020.S2.041
Previous Articles Next Articles
XU Jiaojiao, YANG Hang, GAO Weipeng, FAN Yalei
Online:
Published:
Abstract: There are many problems in traditional cutter replacement of shield, such as complex replacing action and slow disassemble and assemble of cutters by robot. Accordingly, a connecting rod locking cutter fastening mechanism is designed to realize rapid disassembly and assembly of the disc cutter by robot. The stress characteristics of the traditional clamping cutter fastening method are analyzed, and the linkage transmission chain and structural size are comprehensively designed to develop a connecting rod locking cutter fastening structure. The finite element technology and contact theory are used to establish a mechanical model of cutter holder fastening, and the influence of cutter holder design parameters on the structural performance and fastening performance of cutter holder is studied. Through the ANSYS Workbench platform, the stress distribution and deformation of the cutter holder under tunneling condition are analyzed to verify the reliability of the static strength of the new cutter holder. The analytical results show that the new cutter holder can realize the rapid disassembly and assembly of the cutter under the onetime pose adjustment of the robot and meet the mechanical performance requirements of the cutter holder system during shield tunneling.
Key words: shield, cutter holder, cutter changing operation, robot
XU Jiaojiao, YANG Hang, GAO Weipeng, FAN Yalei. Design and Analysis of a New Cutter Holder of Disc Cutter Suitable for Robot Change[J]. Tunnel Construction, 2020, 40(S2): 319-324.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.S2.041
http://www.suidaojs.com/EN/Y2020/V40/IS2/319
Prediction of Surface Deformation of a Shield Tunnel Using Air Pressure Assisted Tunneling Based on Support Vector Machine
Evaluation Standards for Water Tightness of Shield Tail Sealing Grease under Conditions of High Water Pressure
An Experimental Study on Improvement of a Waterproof Sealing Gasket Corner Structure for a LargeDiameter RiverCrossing Shield Tunnel
A Design Scheme for Lateral Launching of a Double Track Shield Tunnel Using a Mined Single Channel with a Composite Structure
Construction Risk Control of a Metro Shield Tunnel in a Curved Receiving Section Obliquely Crossing an Adjacent Existing Station: a Case Study on Nanning Rail Transit Line 5 Crossing underneath Guangxi University Station on Existing Line 1
Theoretical Solution for Failure Mechanism of Circumferential Joint of Shield Tunnel Segment Connected Using Diagonal Bolts
Preassessment of Safety Risk of Shield Tunneling underneath Existing Tunnel Based on Fuzzy Bayesian Networks and Evidence Theory