Abstract: The mechanized construction method for connecting passages can be divided into shield and pipe jacking methods. To clarify the difference between mechanical and freezing methods, the structural characteristics and safety, environmental influence, construction efficiency, and energy consumption of the 21 connecting passages of shield tunnel of Ningbo rail transit line 4 are analyzed.Analytical results demonstrate the following. (1) The main tunnel structures constructed using different construction methods are uniform to guarantee the standardization of the main tunnel structures. (2) Various construction methods can meet relevant structural functions, structural safety, and environmental requirements. (3) The convergence deformation of the main tunnel obtained using the mechanical method is smaller than that obtained using the freezing method, which promotes structural safety. (4) Under the same conditions, the mechanical method requires approximately half the time of the freezing method. Moreover, the power consumption per linear meter of connecting passages obtained using the mechanical method is onetenth of that obtained using the freezing method.
Key words: rail transit, connecting passage, shield method, pipe jacking method, freezing method, settlement deformation, construction efficiency
CLC Number:
U 455.4 
YAO Yanming, HUANG Yi, ZHOU Junhong, XIA Hanyong. Construction Methods for Connecting Passages in Shield Tunnel of Ningbo Rail Transit Line 4[J]. Tunnel Construction, 2021, 41(6): 1007-1014.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.06.013
http://www.suidaojs.com/EN/Y2021/V41/I6/1007
Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines
Characteristics of Stratum Variations for Connecting Passage of Shield Tunnel with Artificial Freezing Method in WaterRich Sand Stratum
Freezing Process by Discrete Element Method Considering Latent Heat of Phase Change and Its Application: a Case Study of Artificial
Freezing Reinforcement Project of Launching End of Zhengzhou
Erqi Square Metro Tunnel
Forward Design and Application of Building Information Modeling in Shenzhen Huangmugang Comprehensive Transportation Hub Project
Construction Technology of Prefabricated Slab Track under Trackless Tooling Mode: a Case Study of Suzhou Rail Transit Line 5
Prediction of Driving Posture and Optimization of Construction Parameters for Shield Based on Support Vector Machine
Design of Long and Steep Slope Section from Aerospace City to East Chang′an Street of Xi′an Metro Line 15
InsertTube Freezing Method for Expanding Construction of Metro Station Based on DoubleLine Shield Tunnel and Its Mechanical Characteristics
Multitube Freezing Temperature Field Considering Range of Influence of Freezing Tubes