Fast Receiving Technology for Multiple LargeDiameter Slurry Shields in UltraDeep Shaft in WaterRich and Weak Strata: A Case Study on Wangjing Tunnel of BeijingShenyang Railway

ZHAI Zhiguo1 HUA Nan1 LIU Liu2   

  1. (1. The 2nd Engineering Company of China Railway Tunnel Group, Sanhe 065201, Hebei, China;2. School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, Hebei, China)
  • Online:2021-02-20 Published:2021-03-06

Abstract: Four largediameter slurry shields should be received in an ultradeep shaft in waterrich and weak strata (clay, silt, and siltyfine sand). Consequently, Ushaped plain diaphragm wall + ultradeep triaxial mixing pile + Rodin jet pile ultrahigh pressure jet grouting is used to consolidate the ground, and the dewatering well is adopted to improve the overall stability and waterstop effect of end soil of the receiving shaft and realize fast shield receiving. Further, the gyroscope orientation and cast point hole for penetration measurement are adopted to ensure the accuracy of shield receiving and provide a basis for fast and precise positioning and installation of the receiving base. Hydraulic drilling and wiresaw cutting are used to break the concrete door of Wangjing tunnel, which significantly improves the door breaking efficiency. The steel ring of the tunnel is installed with double wire brushes as the sealing of the receiving tunnel, which prevents sand and water from gushing effectively when the door is broken, ensures the safety of shield receiving, reduces the installation and removal of the last ring segment, and further rapids the shield receiving. By adopting the abovementioned key techniques and scientifically organizing and coordinating the receiving and dismantling sequence of the four shields, the fast receiving of the four largediameter shields used in Wangjing tunnel of BeijingShenyang railway is realized.

Key words: tunnel, watery and weak stratum, ultradeep shaft, largediameter slurry shield, fast receiving