[1] |
ZHANG Chuanjun, GUI Lisheng, LI Zhijun, WANG Qiulin.
Analysis and Discussion of Labor Cost in Budget Quota
of Railway Tunnel Engineering
[J]. Tunnel Construction, 2021, 41(4): 561-568.
|
[2] |
LYU Yonglin, ZHANG Dongjie, TANG Wenxi, YANG Xuezhong, QIN Xiaofeng, REN Yi.
Adaptability Analysis of SingleCantilever
Tunneling Machine in ShallowCovered
Tunnel Excavation in Busy Urban Areas: a Case Study on
New Hongyan Tunnel Crossing underneath Underground
Shopping Mall
[J]. Tunnel Construction, 2021, 41(4): 649-656.
|
[3] |
SI Jingzhao, WANG Huanlong, CAO Guicai, SHEN Wei.
Analysis of Response Characteristics of Physical
Parameters of Tunnel Seismic
Prediction Method in TBMJammed Section of Gaoligongshan
Tunnel
[J]. Tunnel Construction, 2021, 41(3): 396-401.
|
[4] |
WANG Huanlong, LIU Jianbing, YANG Changyu, ZHU Tingyu.
Case Study of Water Control in a Deep and LargeDiameter
Vertical Railway Shaft in Granite and Analysis of Its
Efficiency
[J]. Tunnel Construction, 2021, 41(3): 402-410.
|
[5] |
LIU Jianbing, YANG Changyu, WANG Huanlong, ZENG Yunchuan.
Engineering Application and Main Control Factors of
Selection of Deep and Large Shaft Location for Railway Tunnel
[J]. Tunnel Construction, 2021, 41(3): 411-418.
|
[6] |
SI Jingzhao, ZENG Yunchuan, LIU Jianbing.
Challenges and Some Thoughts on OpenTBM
Construction in a Railway Tunnel with Complex
Geologies
[J]. Tunnel Construction, 2021, 41(3): 433-440.
|
[7] |
WANG Yafeng, ZENG Jing, JIANG Jiayun.
Construction Technology of Open TBM in Gaoligongshan
Tunnel Crossing a
HighPressure WaterRich WeakFracture Altered Structural Belt
[J]. Tunnel Construction, 2021, 41(3): 449-457.
|
[8] |
ZHOU Bao′an, WU Jian, WANG Lichuan, GONG Lun, MA Xiangfeng, XU Zhaoqiang, ZHAO Wei, ZHANG Peng.
Practice and Discussion on Treatment of Ballastless
Track Deformation of a HighSpeed
Railway Tunnel Caused by Floor Heave Based on Traffic Safety
[J]. Tunnel Construction, 2021, 41(3): 474-482.
|
[9] |
WANG Yafeng.
Key Technologies for TBM Jamming Release of Gaoligongshan
Tunnel under Unfavorable Geologies
[J]. Tunnel Construction, 2021, 41(3): 441-448.
|
[10] |
WANG Feiyang, ZHOU Kaige, FANG Yong, XU Gongyun, WANG Huiwu, ZHUO Bin.
Analysis of SurroundingRock Disturbance Caused by TBM Excavation
of Deepburied Railway Tunnel
[J]. Tunnel Construction, 2021, 41(2): 240-247.
|
[11] |
YAO Zhiyong, MENG Xianglian, DU Shihui, MIAO Xiaoqi, HAN Yongqi, CAI Shaofeng, CHANG Shuaipeng, FENG Wuchao, WANG Peijian.
Experimental Study on Aerogeophysical Prospecting of
Shergyla Mountain Tunnel on ChangduNyingchi Section of SichuanTibet Railway
[J]. Tunnel Construction, 2021, 41(2): 248-257.
|
[12] |
LI Xianjin, LIN Chungang, LI Jing.
New Construction Method for Secondary Lining of
Railway Tunnel and Design of Lining Trolley Scheme
[J]. Tunnel Construction, 2021, 41(2): 293-299.
|
[13] |
田四明, 王伟, 巩江峰.
Development and Prospect of Railway Tunnels in China (Including
Statistics of Railway Tunnels in China by the End of 2020)
[J]. Tunnel Construction, 2021, 41(2): 308-325.
|
[14] |
DU Lijie, HONG Kairong, WANG Jiaxing, LI Qingwei, YANG Yalei, LI Weiwei, HUANG Junge.
Rockburst Characteristics and Prevention and Control
Technologies for Tunnel
Boring Machine Construction of Deepburied Tunnels
[J]. Tunnel Construction, 2021, 41(1): 1-15.
|
[15] |
童建军, 刘大刚, 张霄, 王志龙, 赵思光, 李佳旺.
Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou
Railway Constructed by Mechanized Means
[J]. Tunnel Construction, 2021, 41(1): 116-125.
|