[1] |
DENG Mingjiang, XU Zhenhao, LIU Bin.
Establishment and Application of "1 km+100 m+50
m" Geological Prediction System for ExtraLong TBM Tunnels: a Case
Study on Water Supply Project Ⅱ in Xinjiang, China
[J]. Tunnel Construction, 2021, 41(9): 1433-1450.
|
[2] |
LUO Zhanfu, JIANG Tao, WANG Shugang, JIANG Shuang, WANG Zhuo.
Application of Theoretical Solution of Surrounding
Rock Temperature
in
Gaoligongshan Railway Tunnel: Surrounding Rock Temperature
Distribution Law under Design Air Temperature
[J]. Tunnel Construction, 2020, 40(S2): 32-37.
|
[3] |
ZHOU Nianqing, YANG Haobo, YANG Lei, LIU Xianlin.
Application of EVS Coupled StratigraphicLithologic Threedimensional Geological Modeling Method in Nanning Metro Project
[J]. Tunnel Construction, 2020, 40(2): 238-245.
|
[4] |
LI Hao.
Application of Newtype of Explosion Proof Seismograph to Advanced Geological Prediction of Gas Tunnel
[J]. Tunnel Construction, 2020, 40(2): 261-266.
|
[5] |
LU Song, WANG Xu, LI Cangsong, DING Jianfang.
Design and Implementation of HSP Realtime Prediction Technology Suitable for TBM Construction
[J]. Tunnel Construction, 2019, 39(8): 1255-1261.
|
[6] |
SONG Shangming.
Subclassification of Tunnel Surrounding Rock in Typical SoilRock Mixture Backfill Area in Chongqing
[J]. Tunnel Construction, 2019, 39(6): 919-924.
|
[7] |
XING Xiuju.
3D Transient Electromagnetic Advanced Detection Technology for Karst Tunnel
[J]. Tunnel Construction, 2019, 39(2): 287-293.
|
[8] |
LI Tao, QIU Wenge, LIU Yi.
Development and Application of Refined Management System of Tunnel Geological Information Based on Data Drive
[J]. Tunnel Construction, 2019, 39(1): 68-74.
|
[9] |
FENG Jimeng, LI Hongtao, ZHANG Junru, DING Xiaoqi, CHEN Zheng.
Experimental Study of Relationship between Hysteretic Deformation and Lining Stiffness of Fractured Argillaceous Rock Tunnel
[J]. Tunnel Construction, 2018, 38(7): 1164-1171.
|
[10] |
LIU Wei, WU Chaogang, ZHANG Rui, ZHOU Feipeng.
Analysis of Alteration of Surrounding Rock Classification of Funing Tunnel on YunGui Railway
[J]. Tunnel Construction, 2018, 38(6): 895-900.
|
[11] |
WANG Xueni, HAN Guofeng.
Study of Application of Trend Term Separation Prediction Model and Rescaled Range (R/S) Analysis to Deformation Prediction of Deep Foundation Pit
[J]. Tunnel Construction, 2017, 37(8): 990-996.
|
[12] |
HOU Weiqing, ZHANG Xingyu, YE Ying.
Preliminary Study of Advanced Geological Prediction Based on Seismic Reflection Method for Shield Tunneling
[J]. Tunnel Construction, 2017, 37(8): 1003-1010.
|
[13] |
WANG Guofu, LIU Fengzhou, WANG Dan, MENG Xianyun, WU Yongzhen.
Optimization Analysis of Supporting Scheme of Deep Foundation Pit of Longdongzhuang Station on Line R3 of Jinan Metro Closely Adjacent to a Highrise Building
[J]. Tunnel Construction, 2017, 37(6): 708-716.
|
[14] |
ZHUO Wenhai.
Design and Application of Tangent Circle Method for Metro Lines Design
[J]. Tunnel Construction, 2017, 37(6): 730-734.
|
[15] |
JIN Hua, ZHU Mingming, HE Hongyuan, DANG Rujiao, LI Zhiguo.
Technology of Accurate Detecting of Residual Pile Foundation under Busy Traffic Road in Urban Area
[J]. Tunnel Construction, 2017, 37(6): 753-760.
|