[1] |
WANG Tao, ZANG Jianbin, LI Peng.
A Review on Railway Tunnel Aerodynamics
[J]. Tunnel Construction, 2022, 42(S1): 7-18.
|
[2] |
ZHOU Jianjun, CAI Guangyuan, SUN Feixiang, PENG Zhengyong, GUO Rui, ZENG Shuai, SHI Rongjian.
Numerical Simulation on Flexural Mechanical Properties
of Steel TubeFrozen Soil Composite Structure
[J]. Tunnel Construction, 2022, 42(S1): 40-47.
|
[3] |
ZHANG Zhigang, WU Ben, CHEN Jian, WU Chenglong, LIU Jiajun, LI Jinhui.
Effect of HeavyHaul Train on Bearing Capacity
of Cracked Tunnel Lining
[J]. Tunnel Construction, 2022, 42(S1): 56-65.
|
[4] |
SHUAI Yubing, QIU Jinrun, LI Pengfei, WANG Limin, WANG Hao, WANG Xijun, ZHANG Mingju.
Experimental Study and Numerical Simulation of Bottom
Sealing of Shaft Pump Room in Shield Tunnel Constructed by
Mechanical Method
[J]. Tunnel Construction, 2022, 42(S1): 128-135.
|
[5] |
ZHU Yalin, ZHANG Bin, SHI Ming, LIU Jianjun, WANG Yixian.
Influence of Partitioned Excavation of Deep Narrow
Foundation Pit on Settlement of Neighboring Buildings
in Soft Soil Area
[J]. Tunnel Construction, 2022, 42(S1): 166-173.
|
[6] |
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao.
Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(S1): 238-248.
|
[7] |
LIU Kai, WU Zaixin, YANG Jizhong, OU Xiaoqiang, GUAN Haoyu.
Fatigue Life and AntiVibration
Measures of HighSpeed Railway Tunnel under Aircraft Landing Impact Load
[J]. Tunnel Construction, 2022, 42(S1): 281-288.
|
[8] |
WANG Rulei, WANG Zhijie, XU Haiyan.
Deformation Characteristics of Tunnel Face and
Corresponding Control Measures in FullyWeathered
Red Sandstone Stratum
[J]. Tunnel Construction, 2022, 42(S1): 301-311.
|
[9] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
[10] |
ZHANG Yuqi, QIU Yunjun, GUO Jiantao, WANG Qiangxun, SU Shouyi, RAO Bangzheng.
Design and Application of PileStyle
Reinforcement for Underground Diaphragm Wall under
Narrow Site Condition
[J]. Tunnel Construction, 2022, 42(S1): 389-395.
|
[11] |
TIAN Siming, WU Kefei, YU Li, LI Xu, GONG Jiangfeng, WANG Xindong.
Key Technology of AntiSeismic for Railway Tunnels Crossing Active
Fault Zone
[J]. Tunnel Construction, 2022, 42(8): 1351-1364.
|
[12] |
MA Weibin, WANG Zhiwei.
Research on Prefabrication and Assembly of Railway
Tunnels Excavated Using Drilling-and-Blasting and Prospects of Intelligent Construction
[J]. Tunnel Construction, 2022, 42(7): 1119-1134.
|
[13] |
WANG Yong, AN Zheli, MA Weibin, ZHENG Zefu, GUO Xiaoxiong.
StateofArt and
Development Trend of Tunnel Inspection Technology in
China, Japan, and South Korea
[J]. Tunnel Construction, 2022, 42(7): 1135-1145.
|
[14] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
[15] |
YANG Yurong, HUANG Hongting, YAN Qixiang, LI Ruilin, TANG Junlin.
Outburst Preventive Construction of Rotary Jet
Grouting Enclosure Pile for Railway Tunnel Crossing Gas and CoalRich Strata
[J]. Tunnel Construction, 2022, 42(7): 1300-1307.
|