ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2021, Vol. 41 ›› Issue (S2): 172-179.DOI: 10.3973/j.issn.2096-4498.2021.S2.022
Previous Articles Next Articles
YIN Zhonghui
Online:
Published:
Abstract: To improve the quality of mixing piles and further improve the quality of engineering, the factors affecting the quality of cement mixing piles are analyzed, the causes for quality defects of cement mixing piles are studied, and corresponding solutions are proposed. The influence of sinking and lifting speed, drilling speed, blade width, blade angle, blade number, and blade combination mode of drill rod on the pile formation effect is analyzed, and a mathematical model is established. It is concluded that when the number and the effective mixing width of blade are constant, the greater the drilling speed of the drill rod, the greater the allowable sinking and lifting speed; while the blade spacing does not affect the quality of the mixing pile.
Key words: cement mixing pile, construction parameters, drill rod sinking and lifting speed, rotation speed, distance between blades, mathematical model
CLC Number:
U 45
YIN Zhonghui. Correlation about Construction Parameters of Cement Mixing Pile[J]. Tunnel Construction, 2021, 41(S2): 172-179.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.S2.022
http://www.suidaojs.com/EN/Y2021/V41/IS2/172
Analysis for Influence Factors and Control of Shield Advance Speed Based on Field Measurement Data
Prediction Model for Tunnel Boring Machine Cutterhead Rotation Speed Based on Field Penetration Index and Torque Penetration Index
Application of a DualSpeed Reducer for Main Drive of a TBM Remanufacturing Case of Gaoligongshan Tunnel