| [1] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [2] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [3] |
XUE Guangji, DONG Zhiwei, CHAO Liwei, MA Runbo, SHEN Chao.
Research and Application of
Construction Technology for U-Shaped
Shield Pipe Erecting Machines in Prefabricated Utility
Tunnels
[J]. Tunnel Construction, 2024, 44(6): 1305-1312.
|
| [4] |
DU Lijie, HAO Hongda, YANG Yalei, LI Qingwei, ZHANG Weidong, LIU Jiayi, FENG Hongchao, JIA Lianhui.
Tunnel Boring Machine Selection and Tunneling Attitude
Control Method for Tunnels With Small Turning Curves
[J]. Tunnel Construction, 2024, 44(5): 1106-1115.
|
| [5] |
GUAN Zhenchang, XIE Lifu, ZHOU Yuxuan, LUO Song, XU Chao.
Prediction Model and
Control Method for Shield Attitude Based
on Machine Learning
[J]. Tunnel Construction, 2024, 44(10): 2032-2040.
|
| [6] |
WANG Tiguang.
Impact Analysis of Metro Structures With Different
Construction Methods Repeatedly Crossing Large Municipal Overpasses and
Retaining Walls
Under Complex Environment
[J]. Tunnel Construction, 2023, 43(S2): 78-90.
|
| [7] |
HU Min, PEI Liefeng, WU Bingjian, SUN Junchao, LU Jing.
Current Situation and Prospect of Shield Automatic
Driving Technology
[J]. Tunnel Construction, 2023, 43(3): 383-391.
|
| [8] |
WU Bingjian, WU Huiming, HU Min, SUN Junchao.
Design and Application of a Data Driven
Shield Autonomous Attitude Control System
[J]. Tunnel Construction, 2023, 43(3): 478-485.
|
| [9] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|
| [10] |
JIA Lianhui, CHEN Wentao, FAN Lei, YUAN Zheng.
Design and Application of Key Systems of SuperLarge
Rectangular CrossSection Pipe
Jacking Machine: a Case Study on Pipe Jacking Project
of Changshui Road Crossing underneath Nanhu Avenue in
Jiaxing, China
[J]. Tunnel Construction, 2022, 42(5): 917-928.
|
| [11] |
HUANG Wei, REN Meng, CHEN Peishuai, LUO Huiwu.
Theoretical Analysis Model of Shield Horizontal Attitude
[J]. Tunnel Construction, 2022, 42(1): 83-89.
|
| [12] |
ZHANG Heng, LI Chaoxu, WEI Dong, JIANG Bolin, LIANG Bo.
Optimization Design of SuperLarge
CrossSection Metro Station Constructed by Mining Method: a Case Study on Wulidian Station of Chongqing Metro Line 9
[J]. Tunnel Construction, 2021, 41(S2): 574-581.
|
| [13] |
ZHANG Longguan, LI Zhigang, LU Guizhen, TAN Jiang.
Key Construction Technology of Large Crosssection
Horseshoeshaped Shield:
a
Case Study on Baicheng Tunnel on Menghua Railway
[J]. Tunnel Construction, 2020, 40(S1): 297-306.
|
| [14] |
LI Tiesheng.
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
[J]. Tunnel Construction, 2020, 40(4): 531-537.
|
| [15] |
XIN Zhenggang.
Experimental Study on AttitudeInterlock Control Technology of Pipecurtain Group with Inner Interlock Joints
[J]. Tunnel Construction, 2020, 40(1): 43-49.
|