| [1] |
YU Li, XIAO Yang, GONG Jiangfeng, CHEN Lanxin, WANG Leming, ZHANG Xiao.
Dynamic Response of Underwater Tunnels and Sandy Strata With Different Under-Track Structures Under Train Load
[J]. Tunnel Construction, 2026, 46(5): 960-969.
|
| [2] |
YANG Shichong, ZHANG Peng, LI Kaiqi, GUO Jingran.
Calculation Model for Jacking Force of Straight Steel Pipe Jacking Considering Lateral Deformation Effect
[J]. Tunnel Construction, 2026, 46(5): 1016-1027.
|
| [3] |
HUANG Mingli, TAN Shiyang, WU Xuan, LI Jiacheng.
Experimental Study on Mechanical Properties of Face Support Structures for Mechanized Construction in Large-Section Mountainous Tunnels
[J]. Tunnel Construction, 2026, 46(4): 665-681.
|
| [4] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [5] |
ZHANG Fa, PENG Ke, CAI Zhiyan, GUO Chengchao.
Load-Bearing Characteristics of Rigid-Flexible Composite Tunnel Lining Based on Model Tests
[J]. Tunnel Construction, 2026, 46(2): 301-309.
|
| [6] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [7] |
CHEN Junwei.
Stress Response of Shield Tunnel Segments Based on
Model Test and Numerical
Simulation
[J]. Tunnel Construction, 2025, 45(S1): 80-87.
|
| [8] |
LI Peng, WANG Quansheng, YU Changyi, FU Zeng.
Construction Technology of Metro Stations Using Triple-Circular Shield
[J]. Tunnel Construction, 2025, 45(9): 1756-1767.
|
| [9] |
MEI Jiahao, ZHANG Peng, LI Shuiming, ZHANG Yunlong, XU Yong, WU Rudong.
Jacking Force Calculation of Rectangular Pipe Jacking
Project Under Different Slurry Lubrication Conditions
[J]. Tunnel Construction, 2025, 45(4): 774-781.
|
| [10] |
ZHANG Chao, GAO Ke, XU Youjun, NIE Xuzhi, WANG Le, LI Xin.
Failure Characteristics and Shear Stiffness of Prefabricated Utility Tunnel Joints Under Weakened Foundation Bed Conditions
[J]. Tunnel Construction, 2025, 45(3): 539-548.
|
| [11] |
ZHAO Hongbo, LIU Guoqing, ZHANG Changliang, ZHONG Huihong, SONG Shenyou, FAN Ziwu, PENG Yingjun, JIN Wenliang.
Application of Neutron Scattering Method for Identifying Voids at Steel Shell-Concrete Interfaces
[J]. Tunnel Construction, 2025, 45(12): 2266-2274.
|
| [12] |
WANG Haitao, WANG Yue, SUN Jiuchun.
Development of A Segment
Uplift Model Test System
[J]. Tunnel Construction, 2025, 45(1): 132-138.
|
| [13] |
YU Guowu, HE Haoshen, ZHAO Teng, LIN Cungang, XIA Bin, LIANG Yu, ZHAO Chenyang.
Large-Scale Model Test Device for Grouting Behind Shield Tunnel Lining and Preliminary Investigation
[J]. Tunnel Construction, 2024, 44(S2): 123-134.
|
| [14] |
HAN Sheng.
Experimental Study on
Construction of a Permanent and Temporary Integrated Prefabricated Underground Diaphragm Wall Model
[J]. Tunnel Construction, 2024, 44(S2): 445-451.
|
| [15] |
LIU Xian, SUN Qihao, FAN Sen, SHU Jicheng.
Sealing Mechanism of
Polyurethane for Leakage During Shield Tunneling
[J]. Tunnel Construction, 2024, 44(S1): 82-91.
|