Economic Comparison of Dimension of Inclined Shaft CrossSection and Ventilation Pipe of DoubleTube Tunnel

PEI Zhenzhen1, 2, WANG Yanan3   

  1. (1.China Railway Tunnel Consultants Co.,Ltd.,Guangzhou 511458, Guangdong, China;2.Guangdong Provincial Key Laboratory of Intelligent Monitoring and Maintenance of Tunnel Structure, Guangzhou 511458, Guangdong,China;3.China Railway Tunnel Stock Co.,Ltd.,Zhengzhou 450001,Henan,China)
  • Online:2022-12-30 Published:2023-03-24

Abstract:

To effectively and economically determining the dimension of inclined shaft crosssection and ventilation pipe of a doubletube tunnel, a case study is conducted on a long inclined shaft in the Xingshandong tunnel of the YichangXingxian connection line. Comparison is conducted on the energy consumption of fans with ventilation pipes under various diameters and corresponding civil work cost of inclined shaft crosssection. The results show that increasing the height of inclined shaft crosssection appropriately, optimizing the layout space of the inclined shaft ventilation pipes, and increasing the diameter of the ventilation pipes can improve the tunnel construction ventilation effect and reduce the overall construction cost of the tunnel.

Key words: long inclined shaft, tunnel, inclined shaft clearance; construction ventilation, duct diameter, fan energy consumption, economic comparison