| [1] |
ZHEN Yabin, LEI Han, ZHONG Junbin, JIAO Yaji.
Internal Force Distribution Pattern of Prefabricated
Circular Open Caisson at Different Construction Stages of Internal
Lining
[J]. Tunnel Construction, 2025, 45(S1): 51-60.
|
| [2] |
SUN Zhenchuan, LYU Qianqian, SUN Feixiang, YANG Zhenxing.
Surrounding Rock Load and Segment Mechanical Behavior of Chunfeng Road Super-Large Diameter Shield Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 84-92.
|
| [3] |
PAN Zhenhua, BAO Weixing, LU Hanqing, CHE Bowen, YIN Yan.
Evolution Pattern of
Temperature Field in Heiqia Tunnel in an Extremely High-Altitude Cold Region
[J]. Tunnel Construction, 2024, 44(9): 1799-1810.
|
| [4] |
QIAO Minglei, LI Sheng, ZHANG Jiangong, WANG Qicai, XUE Yanjin, CHEN Zhigang.
FiveStep Single SideDrift Method for Fenghuangshan SuperLarge CrossSection Loess Tunnel
[J]. Tunnel Construction, 2024, 44(5): 1096-1105.
|
| [5] |
LIU Xiabing, HE Shaohui, MA Jianfei, YU Yana, GUO Jiacheng, ZHANG Jun.
LoadBearing Characteristics of a Double-Layer Primary Support in
Asymmetrically-Pressurized Entrance Section of a Tunnel
With Shallow Cover and Super-Large Span
[J]. Tunnel Construction, 2024, 44(3): 515-525.
|
| [6] |
ZHANG Zhongjie, LYU Peilin, YU Jian, GUO Zhenkun, ZHANG Qingyu, WANG Haoran.
Key Techniques of Constructing Underground Stations Using
Continuous Open Caisson Method
[J]. Tunnel Construction, 2024, 44(3): 554-563.
|
| [7] |
HAN Hui, WANG Ruisong, NI Pengpeng.
Dewatering and Excavation Response of an UltraWide
PitinPit in Binhai Avenue Renovation Project in Shenzhen, China
[J]. Tunnel Construction, 2023, 43(12): 2026-2035.
|
| [8] |
CHEN Songlin, WANG Lichuan, HU Hengqian, WANG Shuying, YANG Zebin, CHONG Panpan, LU Chuang, CHEN Hongwei.
Fault and Fracture Zone Collapse Treatment Technology
for Open Tunnel Boring Machine
Applied in Beijiang Water Diversion Project
[J]. Tunnel Construction, 2023, 43(12): 2122-2132.
|
| [9] |
YANG Wentao, LIU Xiabing, HE Shaohui, ZHANG Xiaohua, WANG Jianjun.
Construction Method and Excavation Response of ShallowBuried SuperLargeSpan
FourTrack HighSpeed Railway
Tunnel: a Case
Study of Xiabeishan No. 1 Tunnel on HangzhouTaizhou
HighSpeed Railway
[J]. Tunnel Construction, 2022, 42(S2): 381-388.
|
| [10] |
XU Qing, ZHANG Sulei, LIU Chang, ZHANG Guodong, CHEN Degang.
Spatial and Temporal Evolution Characteristics of
Mechanical Behavior of Curved
Middle Wall of Composite DoubleArch Tunnel
[J]. Tunnel Construction, 2022, 42(6): 1022-1032.
|
| [11] |
KANG Zengzhu, LUO Xiaoqing, ZHANG Leigang, CHENG Yun, LIU Guanglei.
SelfSinking Open Caisson Construction
Technology for a ShaftType
Underground Garage
[J]. Tunnel Construction, 2022, 42(4): 730-739.
|
| [12] |
HUANG Wei, REN Meng, CHEN Peishuai, LUO Huiwu.
Theoretical Analysis Model of Shield Horizontal Attitude
[J]. Tunnel Construction, 2022, 42(1): 83-89.
|
| [13] |
CHENG Hao, CAO Zhensheng, ZHANG Shaoqiang, TANG Weiyu, LI Xiaochang, ZHANG Zixin.
Structural Characteristics of TalusLike
Rock Mass and Tunnel Stability Analysis: a Case Study
of Tayi Tunnel of JianshuiYuanyang Highway
[J]. Tunnel Construction, 2021, 41(S2): 274-283.
|
| [14] |
LIU Fangming, GUO Meng.
Support Scheme for Deep Foundation Pit of Metro
Station with Connection
Gallery in Soft Soil
[J]. Tunnel Construction, 2021, 41(S2): 421-428.
|
| [15] |
PAN Wentao, WU Fangyin, HE Chuan, LIU Yang, XIE Jinchi, KOU Hao, YANG Wenbo, ZENG Jie, YANG Song.
Construction Methods and Asymmetric Design
Optimization for ShallowBuried
Tunnels Subjected to Unsymmetrical Loads
[J]. Tunnel Construction, 2021, 41(S1): 352-.
|