Tunnel Construction ›› 2024, Vol. 44 ›› Issue (3): 605-616.DOI: 10.3973/j.issn.2096-4498.2024.03.018

Previous Articles     Next Articles

Design and Application of Construction Equipment for Entire Process of CastinPlace Inverted Arch in Central Yunan WaterDiversion Project in China

XUE Jiangsong1, YIN Jiankun2, CHEN Hongming3   

  1. (1. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China;  2. The Second Engineering Company of China First Highway Engineering Co., Ltd., Suzhou 215000, Jiangsu, China;  3. Chongqing Railway Group Co., Ltd., Chongqing 410700, China)
  • Online:2024-03-20 Published:2024-04-28

Abstract: To achieve synchronous construction of open tunnel boring machine(TBM) excavation and castinplace inverted arch, improve the quality of castinplace inverted arch lining, and shorten the project period, the authors designed and developed construction equipment for the entire castinplace inverted arch with large span based on the boundary conditions of castinplace inverted arch construction in long hydraulic tunnels bored by open TBMs. A detailed design of the construction equipment for the entire castinplace inverted arch is conducted based on the functional requirements, main beam, support legs, front and rear climbing rails, walking system, and inverted arch lining. Finally, an innovative idea is proposed to raise the main bridge crane road surface and set up 11 12mlong functional operation areas under the main bridge, which is fully validated on site. The engineering practice achieves the following results: (1) The main bridge support system, walking drive system, and formwork pouring system of the entire process of castinplace inverted arch equipment preliminarily exhibit a good applicable effect. (2) The construction equipment for the entire process of castinplace inverted arch has various advantages such as high assembly efficiency, easy overall movement, high compatibility with the onsite construction process, adequate operating space, and low labor intensity. This helps in realizing an advancing length of 240 m per month and improving the castinplace technology of the inverted arch by TBM construction. However, the equipment occupies a certain space, thereby limiting construction traffic and material transport, which needs to be further studied.

Key words: hydraulic tunnel, open tunnel boring machine, castinplace inverted arch, entireprocess synchronous operation, step walking, separated lining