| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
LIU Bin, JI Lei, LI Changpeng, LUO Yanbin, GE Qiang, CHEN Jianxun, LI Hai.
Stability Analysis of Surrounding Rocks of Horizontally-Layered Mudstone With Weak Interlayer in Single-Track Railway Tunnels
[J]. Tunnel Construction, 2025, 45(S2): 150-162.
|
| [3] |
JIANG Hongyue, WANG Fan, WANG Zhihua, ZHAI Shiji.
Online Prediction of Shield Attitude for Long-Distance Tunneling
[J]. Tunnel Construction, 2025, 45(S2): 236-248.
|
| [4] |
ZHOU Shuliang, WEI Xiaolong, XIE Hongwu, FENG Shuo, LIN Fulong, HUANG Zhen, JIAO Jingbo.
Muck Volume Measurement System Based on Irregular
Triangular Prism Model
[J]. Tunnel Construction, 2025, 45(S1): 88-95.
|
| [5] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|
| [6] |
FU Baiyong, SONG Shenyou, JIN Wenliang.
Vibrodensification Test and Particle Flow Simulation of Rock Cushion in Immersed Tunnels
[J]. Tunnel Construction, 2025, 45(6): 1090-1101.
|
| [7] |
YANG Junsheng, LUO Yubo, FU Jinyang, CHEN Jianwei, WAN Zheng, ZHU Zhiheng.
Over- and Under-Excavation
Detection Method and Application of Variable-Section Tunnels Based on Three-Dimensional Image
Reconstruction Technology
[J]. Tunnel Construction, 2025, 45(4): 687-694.
|
| [8] |
GOU Chengzhi, LIU Yongbin, ZHANG Xiaoping, LI Xinfang, LIU Bingsen.
Research and Application of Front-Mounted
Exploration Drilling and Grouting Reinforcement Technology in China′s
First Remanufactured Open
Tunnel Boring Machine
[J]. Tunnel Construction, 2025, 45(4): 834-843.
|
| [9] |
YU Qingzeng, NING Xiangke, ZHANG Xingbin, LI Lei.
Development and Application of a Full-Face
Inclined-Shaft Boring Machine With
a Gravity-Mucking System: A Case Study of Luoning
Inclined Shaft
[J]. Tunnel Construction, 2025, 45(4): 852-860.
|
| [10] |
GONG Jiangfeng, WANG Wei, LI Xu, HE Wei, YUAN Yi, WANG Fang, YANG Changxian, DING Xiang, HAN He, LI Li, CAO Yong.
Statistics of China′s Railway Tunnels by the End of 2024 and
Overview of Tunnels of New Projects in 2024
[J]. Tunnel Construction, 2025, 45(3): 636-653.
|
| [11] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
| [12] |
SONG Yaodong, ZHENG Xiaobing, ZHU Ying, LI Jianjun, CAO Chenxu.
Extraction Method of Steel-Arch Locations in TBM Tunnels Based on Laser Point-Cloud Feature Template Matching
[J]. Tunnel Construction, 2025, 45(11): 2091-2099.
|
| [13] |
LIAO Yunyang, ZHANG Heng, LIAO Rupeng, LEI Mingcheng, DING Bosong, WANG You.
Influence of Metal Ion
Complex on ζ Potential
in Shield Muck During Solidification
[J]. Tunnel Construction, 2024, 44(S2): 144-151.
|
| [14] |
ZHU Jie, YANG Chen, CUI Meng, FU Yueyou, JIA Hongyan, HAN Mengmeng.
Surrounding Rock Stability
of Main Caverns of Underground Water-Sealed Cavern Based on Safety Factor
[J]. Tunnel Construction, 2024, 44(S2): 179-191.
|
| [15] |
KANG Jia′an, SHANG Erdong, YU Peng, LI Rongxin, HUO Xiangyu.
Research and Application of Optimal Drilling Efficiency Based on Rock-Drilling
Trolley
[J]. Tunnel Construction, 2024, 44(S1): 265-273.
|