Abstract: The advantages and disadvantages of construction technologies are analyzed with the construction of Gaoyikou station on Line 6 of Chongqing rail transit as an example. The paper can provide reference for the construction scheme selection of the similar projects in the future.
Key words: Chongqing rail transit, shallowcover and mined tunnel, subway station, rapid construction
FAN Yuhui. Rapid Construction Technologies for Subway Station with Shallow Overburden: Case Study on Chongqing Rail Transit[J]. Tunnel Construction, 2011, 31(S2): 187-190.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/IS2/187
BIMBased Automatic Acquisition and Intelligent Control Method for Pipeline Installation Schedule for Auxiliary Works of Subway Station
Development and Prospect of Immersed Tunnel and Artificial Island Technology