ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (2): 218-222.DOI: 10.3973/j.issn.1672-741X.2012.02.018

• wenzhang • Previous Articles     Next Articles

Construction Technology for Junction Section between Horizontal Adit and  Main Tunnel in Soft Ground: Case Study on Sanlian Tunnel

HU Chunting, LIU Yancang   

  1. (China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2012-01-04 Revised:2012-02-26 Online:2012-04-20 Published:2012-05-03

Abstract: Construction countermeasures, including strengthening the support of the horizontal adit, adjusting the roof ripping construction organization, optimizing the construction techniques, optimizing the design of the junction section of the main tunnel and strengthening the management, are adopted, so as to achieve safe and rapid construction of the junction section between the horizontal adit and the main tunnel. In the end, safe construction is guaranteed, the cost is reduced, the roof ripping construction period is shortened to 7 days and the rapid roof ripping construction of No. 13 and No. 14 horizontal adits is realized.

Key words: Sanlian tunnel, soft ground, junction section, rapid roof ripping