Abstract: The construction of junction sections of long tunnels is the key points of the tunnel construction. There are many junction section construction methods. The features of the junction section construction methods adopted in the construction of Muzhailing tunnel, Tongzhai tunnel and Taoshuping tunnel on LanzhouChongqing railway are presented, compared and analyzed, so as to achieve safe, economic and rational junction section construction methods. It is concluded that the risks, geological conditions and project features should be considered in the selection of the junction section construction methods and that attention should be paid to the construction procedure transition, construction organization and key technologies.
Key words: long tunnel, junction section, reverse enlarging method, pilot method, double connection gallery method
ZHANG Wenqiang. Selection of and Application Analysis on Construction Technologies for Junction Sections of Long Tunnels[J]. Tunnel Construction, 2012, 32(3): 383-387.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.03.022
http://www.suidaojs.com/EN/Y2012/V32/I3/383
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway