[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
YI Xin, YU Nan, SHI Jingjing, QIU Hui.
Research on Dynamic Benchmark Rate of Return
of PPP Rail Transit Project
[J]. Tunnel Construction, 2020, 40(7): 964-971.
|
[4] |
LI Shenkui.
Numerical Analysis and Model Test of Hourglassshaped
Karst Collapse in Wuhan Area
[J]. Tunnel Construction, 2020, 40(7): 981-987.
|
[5] |
ZHANG Li, SU Rui, HE Chuan, FENG Kun, FANG Ruoquan, XU Peikai.
Fullscale Experimental Study on Bending
Performance of Segmental Joints of Large
Crosssection Shield Tunnel under Pure Compressive Bending Condition
[J]. Tunnel Construction, 2020, 40(7): 997-1003.
|
[6] |
ZHANG Yujie, WANG Yuan, WANG Zhikui, FENG Di, LIU Sijin, XU Shujun.
Influence of Particle Size and Content of Coarseparticle
Materials on Filmforming
Effect of Slurry in High Permeability Formation
[J]. Tunnel Construction, 2020, 40(7): 1004-1010.
|
[7] |
YAO Yanming, HU Xinpeng, LI Fayong, XIAO Guangliang, HUANG Yi, XIA Hanyong, ZHOU Junhong.
Construction Technology and Application of
Disassembled Shield Passing Through Station in Confined Space: a
Case Study on Ningbo Railway Station
[J]. Tunnel Construction, 2020, 40(7): 1035-1040.
|
[8] |
ZHANG Longguan, LI Zhigang, TAN Jiang.
Launching and Receiving Technology of Large Crosssection Horseshoeshaped
Shield Used in Baicheng Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1041-1048.
|
[9] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[10] |
WU Xianguo, WANG Lei, CHEN Hongyu, ZHANG Limao, ZHANG Kainan.
Design and Realization of Health Monitoring System for
Operation Metro Structure Based on BIM based Internet
of Things
[J]. Tunnel Construction, 2020, 40(6): 905-914.
|
[11] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[12] |
ZHANG Yazhou.
Numerical Simulation on Waterproof Capacity of Shield Tunnel
Joints Considering Working State of Sealing Gasket Surface
[J]. Tunnel Construction, 2020, 40(6): 813-820.
|
[13] |
SHI Qingtao, WU Wenqing, LU Ye.
Mixing Proportion and Working Mechanism of Inorganic Binder-Waste Mud Composite Cementing Materials
[J]. Tunnel Construction, 2020, 40(5): 629-635.
|
[14] |
CHEN Xianzhi, CHENG Yong, YANG Xiaolong, LIU Fei, HU Qinxin, LIU Pengfei.
Experimental Study on Ground Conditioning Technology for EPB Shield Boring in Water-rich Gravel Stratum
[J]. Tunnel Construction, 2020, 40(5): 636-643.
|
[15] |
HUANG Jieqing, LI Ying, LIU Xingwang.
Two-stage Conjoint Analysis Method for Tunnel Structures under Unloading
[J]. Tunnel Construction, 2020, 40(5): 672-678.
|