| [1] |
XIE Yipeng, LIANG Xiong, YANG Junsheng, PENG Xuejun, LIU De′an.
Stability of Large-Section Excavated Tunnel Face in Badong Fomation Mudstone Considering Water-Rock Softening
Effect
[J]. Tunnel Construction, 2024, 44(S1): 274-285.
|
| [2] |
LIU Hanlong, JIANG Jiaqi, LIU Zhicheng, ZHANG Wengang, SUN Weixin, YANG Wenyu, LIU Maoyi, WU Daifeng, CHU Liang, ZHANG Tao.
Review of Design and Calculation Methods for Minimum Overburden Thickness of Shield Tunnels in Water-Rich Environment
[J]. Tunnel Construction, 2024, 44(6): 1127-1144.
|
| [3] |
KONG Desen, TENG Sen, ZHAO Mingkai, SHI Jian.
An Improved ThreeDimensional Model of Shield
Tunnel Face and Its Stability Study
[J]. Tunnel Construction, 2023, 43(9): 1463-1472.
|
| [4] |
LIU Ke.
Key Design Technology for Large Cross-Section
Mechanized Construction of Mountainous Tunnels
[J]. Tunnel Construction, 2022, 42(4): 703-713.
|
| [5] |
童建军, 刘大刚, 张霄, 王志龙, 赵思光, 李佳旺.
Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou
Railway Constructed by Mechanized Means
[J]. Tunnel Construction, 2021, 41(1): 116-125.
|
| [6] |
PENG Lei, HE Wenmin, CHANG Yawen, KONG Lingchang, YANG Jiangpeng, ZHU Peng.
Compressed Air Foam System and Its Foaming Performance
[J]. Tunnel Construction, 2019, 39(11): 1815-.
|
| [7] |
MA Hui, ZHU Siran.
Study of Airtightness of Filter Cake of Paste HDN
[J]. Tunnel Construction, 2018, 38(S1): 15-19.
|
| [8] |
WANG Zhijian.
Research on Key Technology of Large Crosssectional Mechanized Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
[J]. Tunnel Construction, 2018, 38(8): 1257-1270.
|
| [9] |
LIU Dagang, YAO Meng, ZHANG Xiao.
Stability Evaluation and Control Measures for Tunnel Face of Large Crosssectional Tunnel on ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2018, 38(8): 1311-1315.
|
| [10] |
ZHANG Meng, SUN Cheng.
Technologies for Largediameter Earth Pressure Balance Shield Boring in Complex Strata
[J]. Tunnel Construction, 2015, 35(S2): 157-161.
|
| [11] |
HAN Weifeng, CHEN Kui, ZHANG Bing.
Verification Analysis on Design of Shield Cutterhead under Abruptchanging Loading Conditions
[J]. Tunnel Construction, 2015, 35(9): 957-961.
|
| [12] |
YAO Zhanhu, CHEN Fangwei, CHEN Yu.
Saturated Hyperbaric Operation under Compressed Air: Case Study on Construction of Weisanlu Rivercrossing Tunnel by Largediameter Slurry Shield
[J]. Tunnel Construction, 2015, 35(2): 185-190.
|
| [13] |
WU Hebei, GUAN Huisheng, ZHANG Yu.
Shield Type Selection and Key Parameter Calculation: Case Study on Shield Machine for South Railway StationShenxianshu Station Section on Line 7 of Chengdu Metro
[J]. Tunnel Construction, 2015, 35(2): 191-196.
|
| [14] |
RONG Liang, YANG Hongjun .
Settlement Control Technology for Tunnel Crossing Underneath Zhongzhou Avenue in Zhengzhou Constructed by Superlarge Rectangular Crosssection Pipejacking Machine
[J]. Tunnel Construction, 2015, 35(12): 1338-1344.
|
| [15] |
RONG Liang, YANG Hongjun.
Attitude Control Technology for Superlarge Crosssection Rectangular Pipejacking Machine: Case Study on Tunneling Crossing Underneath Zhongzhou Avenue in Zhengzhou
[J]. Tunnel Construction, 2015, 35(10): 1097-1102.
|