Comprehensive Construction Technologies for Superlarge Crosssection Mined Tunnel Crossing underneath Adjacent Existing Railway Line

XIONG Anchao   

  1. (Beijing Construction Co., Ltd. of China Railway Tunnel Group, Beijing 100022, China)
  • Received:2012-08-02 Revised:2012-09-10 Online:2012-12-20 Published:2013-02-19

Abstract:

Safety protection technologies, including reinforcing existing running railway line track and bed, advance large pipe roofing and fullface grouting, are used in the construction of DK278+300~+380 section of Shijiazhuang tunnel on BeijingShijiazhuang passengerdedicated line crossing underneath ShijiazhuangTaiyuan running railway line, so as to avoid collapse and settlement of the railway bed and track of existing railway line and to guaranteed the safe running of the existing railway line. Conclusions drawn are as follows: 1) The construction program should be dynamically adjusted on basis of monitoring data. 2) The safety of the existing railway and the tunnel can be guaranteed by means of pertinent technologies.

Key words: crossing underneath adjacent existing railway line, superlarge crosssection, mined tunnel