| [1] |
XIA Runhe, SHEN Qi, OUYANG Guowei, MA Chen, LI Yiming.
Green Ecological and Environmental Protection
Technologies and Management Practices During Construction Period
of Long Tunnels
[J]. Tunnel Construction, 2025, 45(S1): 249-259.
|
| [2] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
| [3] |
DU Quan, DU Yingchun, YANG Rui, WEI Kang, WAN Youcai, MEI Yuangui.
Full-Scale Test on Internal and External Pressure Wave Characteristics of High-Speed
Trains in Long, Steep Tunnels and Tunnel Group Environments
[J]. Tunnel Construction, 2024, 44(7): 1454-1464.
|
| [4] |
DENG Hong, WAN Youcai, MEI Yuangui.
Variation Pattern in Air
Resistance of a Train Passing Through Long and Extra-Long High-Speed
Railway Tunnels in Plateau Areas
[J]. Tunnel Construction, 2024, 44(7): 1491-1501.
|
| [5] |
ZHOU Kefa, HUANG Baolong.
Design of Secondary Water Cooling System for Freezing Construction
of Long Tunnels
[J]. Tunnel Construction, 2024, 44(1): 109-115.
|
| [6] |
CHEN Qingxiang, SHI Lingna, WEN Sen, TU Yun, WU Jinsuo.
Effect Evaluation of Wall Sign in Highway Long Tunnels
Based on Fixation Characteristics
[J]. Tunnel Construction, 2023, 43(S2): 144-150.
|
| [7] |
YE Yanzhong, ZOU Debing, WANG Hanhui, SU Kai.
Evolution of Pore Pressure Around Tunnel Face and
Influence of Longitudinal Value
of ThreeDimensional Seepage Calculation on It During Construction of a Water Conveyance Tunnel With Rich Water
[J]. Tunnel Construction, 2023, 43(S2): 230-236.
|
| [8] |
LIU Xu, WU Honggang, GUAN Wei, SUN Hao.
Applicability of Uneven Convergence Mode in Soft Rock
Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 240-247.
|
| [9] |
XU Pengzu, YANG Yandong, XU Haifeng, LIU Wanlin, WANG Tianyi.
Synchronous CastinPlace
Construction Technology and Equipment Development for
TBM Tunnel Invert Arch
[J]. Tunnel Construction, 2023, 43(S1): 480-486.
|
| [10] |
REN Yang, WU Yuehua, LI Tianbin.
Calculation Method and Application of Initial InSitu
Stress Interpolation in
Longitudinal Section of DeepBuried Long Tunnel
[J]. Tunnel Construction, 2023, 43(11): 1908-1915.
|
| [11] |
CHEN Siyu, FANG Qianbao, SONG Xi, ZHANG Luhua, WANG Feng.
Smoke Exhaust Structure Type of Emergency Rescue
Station of
Extralong Tunnel at HighAltitude Plateau Areas
[J]. Tunnel Construction, 2022, 42(S1): 382-388.
|
| [12] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
| [13] |
YUE Zhen, MA Sen, LIU Lili, HE Dapeng, HU Jiangbi, YU Jianyou.
Setting Length of Driving Fatigue Arousal Section in a
Tunnel
[J]. Tunnel Construction, 2022, 42(6): 1014-1021.
|
| [14] |
HUANG Mingliang, ZHANG Zhenguang, XU Jie, JIANG Hong, BAO Heli, LIU Xian.
Measuring of Shaft Wall Stress in Caisson Construction
Process Based on Vertical Shaft Sinking Machine: a Case Study of
CaissonType Underground
Intelligent
Parking Garage Project in Nanjing, China
[J]. Tunnel Construction, 2022, 42(6): 1033-1043.
|
| [15] |
ZHAO Shulei, WANG Haiyang, ZHAO Ningyu, GUAN Ruishi, ZHENG Shiyue, PENG Wenbin.
Migration Law of Pollutants under DeadEnd
Limit Ventilation Distance of Milashan Tunnel#br#
[J]. Tunnel Construction, 2021, 41(S2): 367-374.
|