| [1] |
LI Dongni, CHEN Peng, XIONG Jianhui, XU Shunming.
A Microscopic Pedestrian Simulation Assessment Method for Renovation Stage of Metro Stations
[J]. Tunnel Construction, 2026, 46(S1): 436-442.
|
| [2] |
ZHANG Shishu, DENG Xingfu, CHENG Lijuan, LU Wei, JIANG Zhongming, YANG Xue, LIU Chenzhi, HUANG Xiangyi, LIAO Junhui, SHI Zhaofeng, XIAO Ningning, YIN Chonglin.
Reconstruction Method of Idle Hydropower Caverns for Compressed Air Energy Storage
[J]. Tunnel Construction, 2026, 46(7): 1533-1545.
|
| [3] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [4] |
ZHAO Jingwei, LI Haoqi, SUN Yu.
Evaluation of Spatial Integration in Metro Station Areas From Perspective of Urban Renewal: A Case Study of Shinan District, Qingdao, China
[J]. Tunnel Construction, 2026, 46(1): 46-59.
|
| [5] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [6] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [7] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [8] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [9] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [10] |
LIU Jiajie, XIONG Hao, CHEN Xiangsheng.
Simulation of Flood Routing Processes in Semi-Enclosed
Underground Spaces Based
on Smoothed Particle Hydrodynamics-Discrete Element Method
[J]. Tunnel Construction, 2025, 45(S1): 125-135.
|
| [11] |
DENG Shaojun.
Innovative Design of Side Platform Stations on
Underground First Floor of Metros and Associated Issues: A
Case Study of Industrial Park Railway Station of Suzhou Metro Line 8
[J]. Tunnel Construction, 2025, 45(S1): 217-225.
|
| [12] |
TAN Jianbing, YANG Jianli, CAO Weiming, SHI Chenghua, PENG Xingyu.
Blasting Excavation Control Technology for Ultra-Deep
Shafts Adjacent to Extra-High Voltage Substations
[J]. Tunnel Construction, 2025, 45(S1): 308-317.
|
| [13] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|
| [14] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [15] |
LI Peng, WANG Quansheng, YU Changyi, FU Zeng.
Construction Technology of Metro Stations Using Triple-Circular Shield
[J]. Tunnel Construction, 2025, 45(9): 1756-1767.
|