| [1] |
CAO Xiaoyong, ZHANG Menghan, XI Weizheng, XU Ping, YE Fei, HAN Xingbo.
Corrugated Steel Support Design for Highway Tunnel
Shafts: A Case Study of Yinggeling Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 182-192.
|
| [2] |
CHEN Jiandang, CHEN Liqiang, XU Shunming, WANG Xiaofei.
Construction Technology of Shield Translation
Launching Under Limited
Site Conditions
[J]. Tunnel Construction, 2023, 43(S2): 485-491.
|
| [3] |
GUO Zhi, QU Qiufen, FAN Zhiguo, LIU Guitao, LU Xiaofeng, GONG Yinglei.
Construction Technology Innovation of Double-Shield
Tunnel Boring -Machine in Qingdao Metro Line 1
[J]. Tunnel Construction, 2021, 41(8): 1385-.
|
| [4] |
KONG Qian, YANG Rui.
Influence of Delayed Steel Support on Support System
of Foundation Pits
[J]. Tunnel Construction, 2021, 41(12): 2113-2120.
|
| [5] |
WANG Zhijie, LI Zhen, CAI Libin, LI Hengyi, XU Haiyan.
Research on Application Technology of Steel Support
Servo System
for Foundation Pit
[J]. Tunnel Construction, 2020, 40(S2): 10-22.
|
| [6] |
HE Yuan, YANG Zhao, YANG Qing, ZHONG Han,WU Shiqi.
Key Technologies for Steel Sleeve Launching of Large-diameter Slurry
Shield Used in Karnaphuli River-crossing Tunnel in Bengladesh
[J]. Tunnel Construction, 2020, 40(3): 426-434.
|
| [7] |
YANG Zhiyong, YANG Xing, JIANG Yusheng, WANG Dong, ZHENG Yaofu, DING Yaowen .
Construction Control Technology of Shield Overcrossing Adjacent Existing Operation Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1898-.
|
| [8] |
JIN Shengji, CHEN Hua, SHU Zhe, HE Lijuan.
Axial Force Monitoring and Numerical Simulation of Steel Supports in an Opencut Expressway Tunnel Foundation Pit
[J]. Tunnel Construction, 2018, 38(5): 740-746.
|
| [9] |
LI Feiyu, HU Yanwei, LI Longfei.
Assembling Technology for Partial Segment of Shield with Horseshoeshaped Crosssection
[J]. Tunnel Construction, 2017, 37(9): 1162-1166.
|
| [10] |
DU Baoyi, SONG Chaoye, HE Weiguo, LI Kai.
A Method for End Soil Reinforcement for Shield Launching in a Seacrossing Metro Tunnel
[J]. Tunnel Construction, 2017, 37(6): 761-767.
|
| [11] |
WANG Mingsheng.
Key Technologies for Slurry Shield Crossing Shallowburied Water Permeable Strata
[J]. Tunnel Construction, 2016, 36(5): 569-576.
|
| [12] |
LIU Jun, XUN Guifu, WANG Fang, JIN Xin.
Study on Numerical Simulation of Thrusting Force of Shield Launching and Receiving: A Case Study on Glassfiber Reinforced Plastic (GFRP) Pile Cut Directly by Shield Machine Used in Line No. 15 of Beijing Metro
[J]. Tunnel Construction, 2016, 36(3): 264-269.
|
| [13] |
GUAN Baoshu.
Tunneling by Mining Method: Lecture IV: Steel Arch
[J]. Tunnel Construction, 2016, 36(2): 123-130.
|
| [14] |
LIU Zhiguang, ZHANG Jinwei, DUAN Wanling.
Study of Transfer Scheme among Jinrongjie Station, Existing Transfer Station and Planning Station of Beijing Metro
[J]. Tunnel Construction, 2016, 36(12): 1492-1499.
|
| [15] |
SHUAI Liumei, LI Guoqing.
Transfer Scheme with No Roreserved Node: A Case Study on Chegongzhuang Station of Beijing Metro
[J]. Tunnel Construction, 2016, 36(1): 66-70.
|