Tunnel Construction ›› 2014, Vol. 34 ›› Issue (增刊): 48-55.DOI: 10.3973/j.issn.1672-741X.2014.S.008
Previous Articles Next Articles
Shou K J, Hsieh C Y
Received:
Online:
Published:
Abstract:
NoDig construction in the city might still encounter of difficulties. However, the difficulties or obstacles, which might cause schedule delays and damage to the pipes. This study considered different overcut range, sticking position, resistance, jacking force, and the location of jacks, etc., for the straight line and curved pipe-jacking. The ABAQUS finite element software was applied for threedimensional numerical simulations for straight line pipejacking with different difficult situations.
Key words: nodig, pipejacking, numerical analysis, overcut, stuck
CLC Number:
TU 47
Shou K J, Hsieh C Y. Analysis of Overcut and Stuck Effects on Interaction between Soilpipe and Ground when PipeJacking in Gravel Formations[J]. Tunnel Construction, 2014, 34(增刊): 48-55.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.S.008
http://www.suidaojs.com/EN/Y2014/V34/I增刊/48
Strata Deformation Caused by Construction of Prefabricated Suspended Sinking Shafts in Soft Soil Areas: A Case Study of a Working Shaft of a Connecting Pipe in Shanghai, China
Block Division Scheme for Prefabricated Secondary Lining in Railway Tunnel Based on Analytic Hierarchy Process
Support Scheme for Deep Foundation Pit of Metro Station with Connection Gallery in Soft Soil
Numerical Analysis of Face Stability of LargeDiameter Slurry Shield Used in Mawan Subsea Tunnel in Complex Strata
Construction Methods and Asymmetric Design Optimization for ShallowBuried Tunnels Subjected to Unsymmetrical Loads
Study on influence of ground settlement in Tjoint connecting passage with mechanical Pipe Jacking method: With the example of the
demonstration project of Tjoint construction of connecting passage with pipe jacking method in Wuxi Metro Line 3
Study on Influence of Large Crosssection Rectangular Pipe Jacking Construction on Vertical Deformation of Strata under Multiple Factors