| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
ZHOU Zhong, LI Shishuai, LU Wanghao.
A Method for Data Augmentation and Intelligent Recognition of Crack Defects in Highway Tunnel Linings by Integrating Deep Convolutional Generative Adversarial Networks and Dual-Task YOLO Model
[J]. Tunnel Construction, 2025, 45(S2): 380-389.
|
| [3] |
LIU Xuezeng, FANG Maoliu, WU Dexing, LI Yinping, LIU Xingen, LI Gang.
Status and Development of Rapid Detection Technology for
Tunnel Structural Defects
[J]. Tunnel Construction, 2025, 45(4): 657-676.
|
| [4] |
ZHANG Hongda, MENG Xianjun, HAN Weifeng, ZHANG Chanjuan, JIANG Yongcheng, ZOU Qiang.
Fault Diagnosis Strategy for Magnetostrictive Sensor
Test Platform Based on Steady State Recognition
[J]. Tunnel Construction, 2025, 45(4): 730-739.
|
| [5] |
WANG Weiqi, LIAN Changjiang, LI Jianping, CHEN Zhiyong, CHENG Donghai, ZHAO Fangchang.
Identification Technology for Tunnel Surrounding Rock Properties Using Microtremor Detection and Magnetotelluric Methods
[J]. Tunnel Construction, 2025, 45(12): 2313-2323.
|
| [6] |
YUAN Zhenyu, , YE Zhendong, AN Zheli, MA Weibin, HU Honglin, GUO Zigang.
Elaborate Inspection Method
for Tunnel Lining Quality Based on
Ultrasonic Phased Array
[J]. Tunnel Construction, 2024, 44(S2): 237-244.
|
| [7] |
BAO Xiaohua, LI Junhong, CHEN Xiangsheng, SHEN Jun, LIU Ziming, YAO Yi.
Research Status and Prospects of Quality Control
Methods for Segment Assembly in Underwater Shield Tunnels
[J]. Tunnel Construction, 2024, 44(4): 643-662.
|
| [8] |
QIN Yawei, TAN Yi, JU Wanglai, CHEN Bin.
Collapse Risk Assessment of Mountain Tunnels Based on
SetPair Analysis Theory and Digital Platform
[J]. Tunnel Construction, 2024, 44(3): 475-483.
|
| [9] |
DAI Zhiren, HU Ruiqing, WANG Zeyu, ZHAO Qichao.
Mechanism and Treatment Measures of Water and Sand
Inrush in
Operational Tunnel in Karst Area
[J]. Tunnel Construction, 2023, 43(S2): 369-377.
|
| [10] |
SUN Hao, JIA Lianhui, WEI Xiaolong, LIN Fulong, MENG Xiangbo.
Fault Diagnosis Method of Disc Cutters of Atmospheric
Shield Cutterhead Based on Machine Learning
[J]. Tunnel Construction, 2023, 43(S1): 550-557.
|
| [11] |
NIU Guoliang.
Application of Controlled Drainage Using Pressure
Relief Valves for Single-Shield Tunnel Boring Machine
Segmental Linings
[J]. Tunnel Construction, 2023, 43(12): 2089-2097.
|
| [12] |
FEI Jianbo, WEI Jiayan, JIN Jiakang, MA Weibin, CHEN Xiangsheng.
Design and Application of Seismic Isolation Structure
for Mountain Tunnels in EarthquakeProne
Areas
[J]. Tunnel Construction, 2023, 43(11): 1935-1943.
|
| [13] |
QIAO Xiong, YANG Xin.
Current Situation and Development of Causes of
Secondary Lining Crack in
Loess Tunnel and Countermeasures
[J]. Tunnel Construction, 2023, 43(10): 1657-1676.
|
| [14] |
ZHU Jiasong, LEI Zhanzhan, LUO Xianghuan.
ThreeDimensional Ground Penetrating Radar
Attribute Imaging and Information Visualization for
Urban Infrastructure
[J]. Tunnel Construction, 2023, 43(10): 1702-1711.
|
| [15] |
ZHANG Zheng, LIU Ruiqing, HAN Weifeng, YANG Lei, HUANG Liudu, JIANG Yongcheng.
Causes of Low Voltage Electric Appliance Failures of
Shields and Design of TestBed Detection Method
[J]. Tunnel Construction, 2022, 42(S2): 541-547.
|