| [1] |
QIN Yinping, LI Zhanguo, LIU Yongsheng, GU Tianxin, WAN Xueyu, ZHANG Bin.
Key Technologies and Development Trend of Intelligent Large-Diameter-Shield Tunnel
Construction in China
[J]. Tunnel Construction, 2024, 44(S1): 25-35.
|
| [2] |
QIAN Qihu, HU Xiaoqiang, LI Shuchen, CHEN Jian, ZHU Weibin.
Recent Advances in Key Technologies of Shield Tunnel Engineering in China
[J]. Tunnel Construction, 2024, 44(5): 897-926.
|
| [3] |
ZHOU Jianjun, LI Shuaiyuan, JIANG Yihui, YANG Yandong, CHENG Yonglong.
Force Analysis and Application of Main Drive Bearing
of Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(S1): 522-529.
|
| [4] |
WANG Jingwei, CHENG Yonglong, LIU Jinlong, DONG Bingwu, WU Yuanke, SUN Zhihong.
Load Spectrum Compilation for Main Bearing of Shield
Under Complex Operating Conditions
[J]. Tunnel Construction, 2023, 43(6): 1065-1074.
|
| [5] |
LI Taomeng, SUN Haibo, CHEN Qiankun, WANG Xin.
Comparative Analysis of Properties between Two Main
Bearing Seals of LargeDiameter
Shield Tunneling under High Water Pressure
[J]. Tunnel Construction, 2022, 42(S1): 517-525.
|
| [6] |
ZHANG Chanjuan, LIU Ruiqing, LI Lei.
Design and Application of Online
Monitoring System for Homemade Main Bearing of LargeDiameter Slurry Shield: a Case Study of Zhoushan Subsea Highway Tunnel Project in Zhejiang, China
[J]. Tunnel Construction, 2022, 42(S1): 526-535.
|
| [7] |
QIAN Qihu, CHEN Jian.
Analysis of Tunneling Risks of LargeDiameter Shield and Thoughts on Its Challenges
[J]. Tunnel Construction, 2021, 41(2): 157-164.
|
| [8] |
WANG Xulong, ZHU Ye.
Coupled Vibration Analysis of Fullface
TBM Main Body Based on ADAMS
[J]. Tunnel Construction, 2020, 40(9): 1300-1306.
|
| [9] |
HAN Xiaoliang.
Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing
[J]. Tunnel Construction, 2019, 39(S2): 393-397.
|
| [10] |
WANG Xiaoqiang, GUO Zhi, WANG Yidong, LI Changda, HAN Lisen, XU Chaoqun.
Application of Separate Launching Technology of Doubleshield TBM to Qingdao Metro Line No. 1
[J]. Tunnel Construction, 2018, 38(9): 1573-1578.
|
| [11] |
GUO Zhi, WANG Xiaoqiang, LIU Lihuan, XU Chaoqun, LI Changda, QU Qiufen.
Application of Mobile Shuttle Conveyor to Mucking of Doubleshield TBM Tunneling
[J]. Tunnel Construction, 2018, 38(7): 1251-1256.
|
| [12] |
YANG Qiming, KANG Baosheng, YI Xinqian.
Study of Feasibility of Applying Parameter Monitoring to Main Bearing Gearbox of Shield
[J]. Tunnel Construction, 2017, 37(5): 637-640.
|
| [13] |
ZHANG Xiao, HE Fei, LI Puqing, ZHAO Zhenwei.
Design and Installation Technology of TBM Main Bearing Sealing Slide
[J]. Tunnel Construction, 2016, 36(6): 762-765.
|
| [14] |
XU Zan, XIE Peicai.
Measures to Ensure Rapid Boring of Open TBM Based on “4M+1E” Factors
[J]. Tunnel Construction, 2014, 34(6): 569-575.
|
| [15] |
ZHANG Xuejun.
Design and Application of Mountainclimbing Belt Conveyor System: Case Study on West Qinling Tunnel
[J]. Tunnel Construction, 2014, 34(2): 167-172.
|