ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2016, Vol. 36 ›› Issue (8): 960-967.DOI: 10.3973/j.issn.1672-741X.2016.08.011
Previous Articles Next Articles
DING Xianli
Received:
Revised:
Online:
Published:
Abstract:
The design and construction of Metro engineering are usually affected by buildings and traffic on the ground, underground pipelines, structures, construction space and geological conditions, etc. As a result, countermeasures are given as follows: 1) The large span noncolumn structure is combined with composite wall structure so as to meet the construction space requirements. 2) The cutandcover topdown method is adopted so as to guarantee the traffic on the ground and replacement of pipelines and improve the safety of foundation pit. 3) The construction schedules of some stations can be guaranteed by using cutandcover topdown method and construction scheme of tunnel first and station followed. Good effects have been achieved.
Key words: Metro project, narrow space, complex factors, cutandcover topdown method, tunnel first and station followed method, optimization design
CLC Number:
U 455
DING Xianli. Design and Construction of South Renminglu Metro Station in Shenzhen under Complex Environment[J]. Tunnel Construction, 2016, 36(8): 960-967.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.08.011
http://www.suidaojs.com/EN/Y2016/V36/I8/960
CrossSection Shape Optimization Design of Railway Tunnel in Squeezing Rock Based on Deformation Classification
Construction Technology of Integral Translation and UTurn of Large Diameter Shield in Narrow Space: a Case Study of Kanaphuli Tunnel in Bangladesh
Receiving Technology of Multiple Shields in Oblique Cross Passage under Complex Conditions
Separate Launching Technology of EPB Shield in Narrow Space: a Case Study on Shield Tunnel of Singapore Metro C715 Project