Abstract: In order to solve the problems of receiving largediameter slurry shield in strong permeable sand pebble stratum with shallow overburden, based on large diameter slurry shield tunnel of Yuanjiang in Changde City, dry receiving construction technology is proposed. The stability of the whole structure in end reinforcement area is improved and the conditions for shield acceptance are satisfied by using the joint reinforcement methods of RJP superhigh pressure jet grouting, vertical freezing and plastic concrete diaphragm wall in the end reinforcement area. In the process of shield dry receiving, by controlling various construction parameters and grasping the key points of construction timing accurately, shield machine smoothly passes through the existing pipeline and reinforcement area, and the maximum settlement of the pipeline and the surface is controlled within 6 mm and 5 mm respectively so as to ensure the accurate exit of the shield machine. In addition, portal brushes are installed in the steel ring of the portal to prevent soil loss when shield machine exits the tunnel. Meanwhile, synchronous grouting volume is increased and segments are connected and fixed with channel steel to ensure shield tail and support safety during the process of shield machine leaving the tunnel.
Key words: shallow overburden soil, strong permeable sand pebble stratum, large diameter shield, dry receiving, slurry shield, control of tunneling parameters, end reinforcement
CLC Number:
U 45
YAO Yinbin. Construction Technology of Large Diameter Slurry Shield in Strong Permeable Sand Pebble Stratum with Shallow Overburden Soil[J]. Tunnel Construction, 2020, 40(S1): 396-403.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.S1.052
http://www.suidaojs.com/EN/Y2020/V40/IS1/396
Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation Project
Surrounding Rock Load and Segment Mechanical Behavior of Chunfeng Road Super-Large Diameter Shield Tunnel
Experimental Investigation of Slurry Performance in Synchronous Grouting Using Silty Clay For Slurry Shield
Monitoring Method for Shield Tunneling Operations Based on a Double-Layer Long Short-Term Memory Network
Experimental Study on Slurry Pressure and Propagation Path of Soil Fracturing During Slurry Shield Tunneling in Clay Stratum
TimeVarying Consolidation of Grout Prepared by Waste Rock Slag for Grouting Behind Lining and Its Influence on Ground Settlement: A Case Study of Heyan Road Yangtze RiverCrossing Shield Tunnel in Nanjing, China