[1] |
GUO Yong, GUO Xiaolin, JIAN Yongzhou, ZHANG Jian, FENG Tugen, CHEN Zi′ang.
Identification and Prediction of Composite Ratios for
Strata in Metro Shield Tunnel
Using Artificial Bee ColonyBack Propagation Neural Network
[J]. Tunnel Construction, 2024, 44(3): 484-495.
|
[2] |
MAO Jinbo, ZHAO Honggang, HAN Qiang, JI Zhongkui, ZHANG Binbin, LI Yalong.
Safe Thickness of Pregrouting Curtain for Vertical
Shaft Ground and Its Application in Tunnel Ventilation
Shaft: A
Case Study of No. 4 Ventilation Shaft of Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(2): 266-273.
|
[3] |
LI Guoliang, HU Weifeng, LIU Jia, LI Sihan, YE Fei, YANG Yong.
Slope Landslide Mechanism and Stability Control
Technology of Filled Karst Tunnels: A Case Study of Xiaba Tunnel Exit Section of XunchangYuhe Highway in Yibin, China
[J]. Tunnel Construction, 2024, 44(2): 274-281.
|
[4] |
LUAN Yongpeng, GUO Tengfei, DONG Yunhao, MA Chenxiao, PENG Fangle.
Comprehensive Accessible Evaluation and Optimization
of MetroLed Underground Space: A Case Study of
Qingdao
[J]. Tunnel Construction, 2024, 44(2): 321-331.
|
[5] |
MAO Jinbo, LI Yalong, JI Zhongkui, HAN Qiang, ZHANG Xiaohu, ZHANG Binbin, SUN Baijun, ZHAO Honggang.
Grouting Technology for Steeply Inclined Marble with
Rich Water by Increasing Permeability and Drainage: A Case Study of No. 4 Ventilation Shaft of Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(2): 332-340.
|
[6] |
YI Guoliang, CHEN Kui, LU Gaoming, ZHOU Jianjun, FAN Wenchao.
Progress in Shield Tunneling Technology for Urban Underground
Space in China
[J]. Tunnel Construction, 2024, 44(1): 1-20.
|
[7] |
ZHANG Jinxun, JIANG Yusheng, YANG Hao, QI Yi, SONG Yongwei, JIANG Hua, YANG Zhiyong.
BasinShaped Freezing Technology for WaterRich Sandy Gravel Strata
[J]. Tunnel Construction, 2024, 44(1): 78-89.
|
[8] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
[9] |
XIA Fengyong, SUN Shipeng, YAO Dian, CHI Minghua, DENG Bin.
Precision Control Technology for Gravel Foundation
Leveling in Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2024, 44(1): 181-188.
|
[10] |
WANG Tiguang.
Impact Analysis of Metro Structures With Different
Construction Methods Repeatedly Crossing Large Municipal Overpasses and
Retaining Walls
Under Complex Environment
[J]. Tunnel Construction, 2023, 43(S2): 78-90.
|
[11] |
HE Xiaobin, MA Shuai, CHEN Jian, LI Mingyu, YU Liucheng, HAO Jun.
Field Test on Construction Influence on LargeDiameter
Shield Tail Segment Floating of Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 136-143.
|
[12] |
ZHANG Chenming, YANG Li, ZHANG Wenting, ZHANG Xixun, SHI Dan, LI Runnan.
Structural Design of Reconstructing Metro Entrance and
Exit to Sunken Squares
[J]. Tunnel Construction, 2023, 43(S2): 378-386.
|
[13] |
FU Jinyang, ZHANG Hongyu, SUN Qianhui, ZHANG Liangliang, YANG Junsheng, LI Yanan.
Reinforcement Scheme for OpenCut
Highway Tunnel Parallelly-Crossed by Metro Shield Tunnel on North Bank Section of Yellow River-Crossing
Tunnel in Jinan, China
[J]. Tunnel Construction, 2023, 43(S2): 418-427.
|
[14] |
SHU Zhihua, WANG Dingjun, ZHANG Lei, WANG Xianbao.
Deformation Control of MultiStructure
Underpassing and Overpassing an Existing Metro Shield
Tunnel: A Case Study of Gangxiabei Comprehensive Transportation
Hub Project in Shenzhen, China
[J]. Tunnel Construction, 2023, 43(S2): 504-512.
|
[15] |
SUN Xianghui, DONG Zilong, ZHAO Xiaolong, PEI Shengping.
Key Construction Techniques for LargeScale
Transfer Nodes Renovation of Existing Metro Hub
Stations
[J]. Tunnel Construction, 2023, 43(S2): 523-534.
|