[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[7] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[8] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[9] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[10] |
DIAO Jie-Yong.
Comments on Construction of Railway Tunnels in Gascontaining Ground
[J]. Tunnel Construction, 2011, 31(1): 82-87.
|
[11] |
XU Qing-Gao.
Settlement Control Technology Applied in Construction
of Largespan Metro Station Tunnel Crossing
Underneath Existing Metro Line
[J]. Tunnel Construction, 2010, 30(增刊1): 415-420.
|
[12] |
ZHANG Dong-Meng, ZHANG Yu, WANG Geng, WANG Yuan-Han.
Treatment and Utilization of Karst Caves during Construction of
Tunnels in Mountainous Areas
[J]. Tunnel Construction, 2010, 30(增刊1): 454-457.
|
[13] |
TIAN Gong-Meng.
Development of DZ100 Series of Grouting Pumps
[J]. Tunnel Construction, 2010, 30(6): 716-723.
|
[14] |
YAN Yu-Ru, Huang-Hong-Wei, Cheng-Zhi-Yan, Wang-Ju, Zhou-Xin, Lv-E-Lin.
Study on Arrangement Rules and Arrangement Optimization of Shield Cutters
[J]. Tunnel Construction, 2010, 30(5): 508-512,599.
|
[15] |
XU Dai-Hong- , Liu-Cheng-Yu.
Deformation Control Technology for Shallowcovered DoubleTrack
Railway Tunnels underneath Buildings
[J]. Tunnel Construction, 2010, 30(5): 561-564,595.
|