Abstract:
The 3arch tunnel on Xiongmaohuandao link line of Line 10 in Beijing Metro passes through the ground consisting of silty clay and mediumcoarse sand, which is constructed by means of the CRD method. The central drift of the tunnel is excavated first, which is followed by the excavation of the side drifts. The conversion of the forcebearing of the tunnel during construction is very complex and the settlement occurring in different excavation steps has great impact on the settlement of ground. By means of adopting proper construction methods and modifying the reinforcement parameters on the basis of the monitoring data, the safety and stability of the tunnel are guaranteed and the difficult problems in the construction of shallow tunnels with complex forcebearing structures are solved.
Key words:  , 3arch tunnel  , shallow tunnelling metho , tunnel  , construction technology
CLC Number:
 
U459.3
YANG Shi-Wu, HAN Tie-Bei. Study on Construction Technology of A 3arch Tunnel on Xiongmaohuandao Link Line in Beijing Metro[J]. Tunnel Construction, 2007, 27(增刊): 332-336.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/332
Application Status and Analysis of Building Information Model (BIM) Technology in Tunnel Engineering
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink