ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 407-409.DOI: B
• wenzhang • Previous Articles Next Articles
TONG Meng
Received:
Revised:
Online:
Published:
Abstract:
In the paper, the strengthening and replacement of the sidewardmoving primary reinforcement structure of a shallowburied undercut tunnel is presented. Firstly, horizontal support elements and inclined support elements made of Ishaped steel are welded to the sidewardmoving primary reinforcement structure to improve its support capacity and portalshaped support structure are installed for tunnel portions within the scope of 4m away from the tunnel face. When all the temporary supports are installed, backfilling grouting is executed for the arch part of the tunnel. Finally, the sidewardmoving lattice girders are replaced and grouting is executed to improve the support capacity. During the full course of the treatment, monitoring and measurement are executed.
Key words:  , primary reinforcement  , sideward moving  , treatment
CLC Number:
 
U455
TONG Meng. Treatment of Sideward Moving of Lattice Girders of Primary Reinforcement of Shallowburied Undercut Tunnels[J]. Tunnel Construction, 2007, 27(增刊): 407-409.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/407
Application Status and Analysis of Building Information Model (BIM) Technology in Tunnel Engineering
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink