[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
MEI Jialin, TANG Zhennong, DU Zhigang, JIAO Fangtong.
Improvement Countermeasures and Application of Traffic Engineering
Facilities at Entrance Section of Expressway Tunnel
[J]. Tunnel Construction, 2020, 40(4): 545-551.
|
[7] |
WANG Yan.
Construction Risks and Countermeasures for Largediameter Slurry Shield Used in Shiziyang Tunnel on FoshanDongguan Intercity Railway
[J]. Tunnel Construction, 2019, 39(6): 983-988.
|
[8] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[9] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[10] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[11] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[12] |
XIA Runhe.
Analysis of Metro Tunnel Collapse Accident Based on Accident Mechanism and Responsibility and Its Prevention Strategy
[J]. Tunnel Construction, 2019, 39(10): 1601-1609.
|
[13] |
YU Yu, LI Laosan.
Review on Risk Assessment and Control Measures for Tunnels on Hubei Section of ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2019, 39(1): 157-163.
|
[14] |
ZHU Yuhong, CHEN Juwu, MA Hui, ZHAI Lihua.
Risk Analysis and Countermeasures for Excavation of Deep Foundation Pit in Waterrich Composite Strata
[J]. Tunnel Construction, 2018, 38(9): 1538-1545.
|
[15] |
YING Wei.
Case Study on Causes and Treatment Measures for Water Leakages of Highway Tunnels in Taizhou, Zhejiang Province
[J]. Tunnel Construction, 2015, 35(S2): 220-224.
|