| [1] |
ZHANG Xiaoyan, TANG Jinyi, LI Qiang, MENG Lingfeng, LI Hongsen.
Mechanical Properties and Failure Mechanism of Recycled Concrete Prepared From Shield Tunnel Muck
[J]. Tunnel Construction, 2026, 46(S1): 186-195.
|
| [2] |
DENG Shiqiang, LUO Gaofeng, LI Yong, LI Ke, HUANG Yichun, WANG Tong.
Performance Boundary and Failure Mechanism of Visual Algorithm for Displacement Monitoring of Tunnel Structure
[J]. Tunnel Construction, 2026, 46(S1): 317-335.
|
| [3] |
ZHAO Rui, LI Shuchen, WAN Ze’en, YU Chenyu.
Rheological Properties Testing of Shield-Tail Seal Grease and Failure Mechanisms of Shield-Tail Breakdown
[J]. Tunnel Construction, 2026, 46(9): 1965-1979.
|
| [4] |
ZHOU Peng, SHANG Jianxu, ZHANG Tianyu, XU Jiacan, WANG Zinan, HE Enguang.
Rock-Breaking Mechanism and Specific
Energy of Disc Cutters in Tunnel Boring Machines Under
Different Surrounding Rock Pressures
[J]. Tunnel Construction, 2025, 45(5): 887-894.
|
| [5] |
HUANG Fu, XIAO Hui, WANG Yongtao, ZHANG Min, CHEN Jingjing, FANG Wei.
Excavation Face Stability Analysis of a Doubl-Mode Shield
Crossing Soil and Rock Composite Strata Based on Tensile Strength
Cut-off Effect
[J]. Tunnel Construction, 2025, 45(1): 109-119.
|
| [6] |
LI Shouren, XIE Xiongyao, TANG Genji, LI Peifeng.
Progressive Failure Mechanism and Support Optimization of Tunnel Structure in Daliangshan Expansive Soft Rock Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 424-434.
|
| [7] |
LI Dawei.
Failure Analysis and
Solutions for Rotating Body of Shield Tunnel
Segment Assembly Machine
[J]. Tunnel Construction, 2024, 44(S2): 462-469.
|
| [8] |
ZHU Yu, SUN Heng, MEI Shiyuan, YANG Zhiyong, LIU Yihao.
Soil Conditioning Technology for Dual-Mode Shield Tunneling in Medium Coarse Sand-Weathered Rock Composite Strata
[J]. Tunnel Construction, 2024, 44(S1): 427-436.
|
| [9] |
LI Anyun, ZHANG Kai, XU Jinfeng, XIE Xiongyao, KANG Yuanfeng.
Stability of Surrounding Rock and Support Optimization
of a Broken SoftRockInclined
Shaft Bored by Tunnel Boring Machine: A Case Study of
Kekegai SubInclined Shaft
[J]. Tunnel Construction, 2023, 43(11): 1924-1934.
|
| [10] |
YAO Zhibin, XIONG Yongrun, FU Lianjie, QUAN Yongwei, NIU Wenjing, HU Lei.
Failure Mechanism and Support Technology of
Surrounding Rocks in Lithologic Interface
Area of DeepBuried Tunnel Bored by Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(1): 102-111.
|
| [11] |
ZHENG Guanghui, PANG Xiaochao, WANG Kangren.
Failure Mechanism of Shield Tunnel Based on Full-Scale
Experiment and Analysis
of Longitudinal Joint′s Outboard Deformation
[J]. Tunnel Construction, 2021, 41(S2): 165-171.
|
| [12] |
LIU Xuezeng, TANG Jing, SANG Yunlong, SHI Gang, LI Xuefeng.
Model Experimental Study on Influencing Mechanism of
Reverse Fault Stick-slip Dislocation on Cross-fault Tunnel
[J]. Tunnel Construction, 2020, 40(4): 481-489.
|
| [13] |
CHEN Yunyao, ZHANG Junwei, MA Shiwei, LI Xue.
Waterproof Failure Mode and Improvement for Sealing Gasket of Shield Tunnel Segment
[J]. Tunnel Construction, 2019, 39(6): 946-952.
|
| [14] |
WANG Zhan.
Numerical Study on Waterproof Failure Mechanism of Elastic Sealing Gasket of Underwater Shieldbored Tunnel
[J]. Tunnel Construction, 2015, 35(11): 1164-1168.
|
| [15] |
ZHENG Yingren, WANG Yongfu.
Evolution of Rock Mass Pressure Theory and Researches on Tunnel Failure Mechanism
[J]. Tunnel Construction, 2013, 33(6): 423-430.
|