| [1] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [2] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [3] |
HAN Sheng.
Prefabrication and Installation Technology of
Permanent and Temporary Integrated Prefabricated Diaphragm Wall: A Case of Xichong Station of Shenzhen
Metro
Line 8 Phase Ⅲ
[J]. Tunnel Construction, 2025, 45(S1): 260-269.
|
| [4] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [5] |
HUANG Jiahuan, RAO Wei, QIU Tong, CHEN Xiangsheng, CHEN Wuxiong YANG Li, CHEN Kunyang, HE Qiufeng, ZHENG Zhenji, WU Beiyu, LI Aidong, LU Linhai.
Experimental Study on Mechanical Properties of Longitudinal Joints in Prefabricated Two-Wall-in-One Diaphragm Walls
[J]. Tunnel Construction, 2025, 45(3): 556-566.
|
| [6] |
HAN Sheng.
Experimental Study on
Construction of a Permanent and Temporary Integrated Prefabricated Underground Diaphragm Wall Model
[J]. Tunnel Construction, 2024, 44(S2): 445-451.
|
| [7] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [8] |
CHAO Hui, TAN Yong, LIU Tianren.
MesoMechanism of Ground Collapse Induced
by Leaking of Underground
Diaphragm Wall in WaterRich Sandy Strata
[J]. Tunnel Construction, 2023, 43(7): 1180-1189.
|
| [9] |
HUANG Yanjun, YUAN Shan, WANG Cong, CHEN Baoguo, ZHANG Yanlin.
Theoretical Analysis of Displacement and Axial Force
in Support Structures During Dynamic Adjustment of
Internal Support Systems in Foundation Pits
[J]. Tunnel Construction, 2023, 43(5): 761-769.
|
| [10] |
LI Fangbao, LONG Xi′an.
Deformation Characteristics and Applicability Analysis
of Support Structure for Metro Deep Foundation Pit in Soft
Soil in Foshan Area, China
[J]. Tunnel Construction, 2022, 42(S2): 294-304.
|
| [11] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
| [12] |
ZHANG Yuqi, QIU Yunjun, GUO Jiantao, WANG Qiangxun, SU Shouyi, RAO Bangzheng.
Design and Application of PileStyle
Reinforcement for Underground Diaphragm Wall under
Narrow Site Condition
[J]. Tunnel Construction, 2022, 42(S1): 389-395.
|
| [13] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
| [14] |
ZHANG Yazhou, YAO Zhanhu, WEI Chi, ZHANG Xiying, ZHAO Xiaopeng, WU Ronghua, CHENG Xiaoqing.
Discussion on Main Issues of Shield Tunnel
Waterproofing Technology and Its Future Prospect
[J]. Tunnel Construction, 2022, 42(11): 1832-1843.
|
| [15] |
NIU Ruoxin, DONG Haizhou.
Experimental and Numerical Simulation of PumpingTracing
Method for Detecting Leakage in Underground Diaphragm
Wall
[J]. Tunnel Construction, 2022, 42(11): 1889-1897.
|