Construction Technology for Urban Large Crosssection
Mined Tunnels Adjacent to Buildings

TANG  Chao, HE  Shan-Ning   

  1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Beijing 101601
  • Received:2010-05-07 Revised:2010-06-29 Online:2010-08-14 Published:2010-08-25

Abstract:

The difficulties of the mined section of Beijing Rail Underground Transit Project are analyzed, the optional construction methods are compared and in the end pilebeamarch (PBA) method is adopted. The application of pilebeamarch method in the construction of the urban large crosssection mined tunnel adjacent to buildings is presented. In the end, good results have been achieved.

Key words: large crosssection mined tunnel, pile beam arch (PBA) method, ground surface settlement, deep grouting