Abstract:
As the concepts of environmental protection, conservation to water and soil and reducing the change of natural condition are prevailing, safe, energysaving, environmental protection tunnel construction techniques have gradually been carried out in tunnel design and construction. The shallow overburden tunnels used to be constructed by either cut & cover method or concrete slab protection roof and back fill method, which need massive excavation. Under the consideration of reducing excavation, advance support by pipe roof technique, instead of the traditional cut & cover method and concrete slab cover method, is most often used nowadays. This article discusses the construction of a twintube highway tunnel in northern Taiwan with hazardous factors for tunnel construction such as 100m long shallow overburden valley section with only dozens of centimeters to 2 meters soil covered in thickness, and coal debris and abandoned coal pits laid underneath it. Under the consideration of the energy saving, environmental protection and the conservation of water and soil factors, pipe roof method is adopted to pass shallow overburden section. In this case, because the geologic materials are made up of top soils, weathered rock and coal mine debris, the rainy climate causes the surface water affluxes in the valley year to year, which results in the enormous difficulties to the tunnel excavation. However, after several collapses and reinforcement processes, the tunnel can be passed. Therefore, this experience might be the reference of the following similar cases.
Key words: shallow overburden tunnel, collapse, pipe roof
CENG He-Teng, WANG Jia-Liang. Collapse Treatment Technology for Shallow Overburden Underground Excavated Tunnel Crossing Coal Pit Area[J]. Tunnel Construction, 2010, 30(S1): 486-491.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/IS1/486
Experimental Study on Outer Insulation Influence of Profiled Enhancing Freezing Pipes on Effect of FreezeSealing Pipe Roofs
Application of Prefabricated and Assembled Open-Cut Tunnel Structure in Collapse and Rockfall Control of Chengdu-Kunming Railway K279 Section
MesoMechanism of Ground Collapse Induced by Leaking of Underground Diaphragm Wall in WaterRich Sandy Strata
Fault and Fracture Zone Collapse Treatment Technology for Open Tunnel Boring Machine Applied in Beijiang Water Diversion Project
Failure Mechanism and Support Technology of Surrounding Rocks in Lithologic Interface Area of DeepBuried Tunnel Bored by Tunnel Boring Machine
Application of Composed Consolidation Support Technology in Collapse Treatment of a Plateau Railway Tunnel
Tunnel Collapse Mechanism and Control Based on Virtual Support Force Characteristic of Surrounding Rock
Model Experiment of Freezing Law of Pipe Roof Used in Large Underground Spaces with WaterRich Layer
Disturbance Analysis on Existing Shield Tunnel under Collapse of Overlying Sand Layer Induced by Karst Cave
Protection Scheme for Shallow Buried Fourth Track Tunnel with Large Cross Section Passing beneath a Utility Tunnel: a Case Study on GuangzhouFoshan Intercity Passing beneath Huakang Road Utility Tunnel
Key Technologies for TBM Jamming Release of Gaoligongshan Tunnel under Unfavorable Geologies