Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2007, 27 (增刊1) Published: 18 June 2007
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Comments on Construction of Passengerdedicated Railway Tunnels
LUO Qiong, GENG Wei, HE Jian, ZHANG Nian, LV Wen-Long
2007, 27(增刊1): 1-5,22
DOI:
B
Abstract
(
2218
)
PDF
(869KB) (
995
)
Experimental Study on Engineering Behavior of
Gypsum Breccia in Taihangshan Tunnel
XIONG Jiang-Ling, LI Jian-Hua
2007, 27(增刊1): 6-8,15
DOI:
A
Abstract
(
1562
)
PDF
(590KB) (
1452
)
Comments on Excavation Methods of Passengerdedicated
Railway Tunnels with Large Crosssections
SUN Zhao-Yuan, LUO Qiong, GENG Wei, ZHANG Nian
2007, 27(增刊1): 9-15
DOI:
B
Abstract
(
2012
)
PDF
(1467KB) (
1130
)
Analysis on Pressures and Displacement Deformations of
Rock Masses during Excavation of Tunnels in Gypsum Breccia Ground
ZHANG Hui, LI Jian-Hua
2007, 27(增刊1): 16-18,22
DOI:
B
Abstract
(
1978
)
PDF
(1008KB) (
1167
)
Equipment Matching for Inclined Shaft with Railbound
Transportation System and Arrangement of Shaft Station
DIAO Yu-Liang
2007, 27(增刊1): 19-22
DOI:
B
Abstract
(
1963
)
PDF
(948KB) (
1494
)
Construction Technology for Tunnels in Special Gypsum Breccia Ground
JIAO Rui-Hu, LI Jian-Hua
2007, 27(增刊1): 23-26
DOI:
B
Abstract
(
1894
)
PDF
(440KB) (
1190
)
Reasons for Pipe Blocking of Pumped Concrete for Lining of Passenger
dedicated Railway Tunnels and their Prevention Measures
CHEN Zhi
2007, 27(增刊1): 27-29,46
DOI:
B
Abstract
(
1861
)
PDF
(926KB) (
1348
)
Geology Prediction Technology Applied in Changlingguan Tunnel on
Hefei~Wuhan Passengerdedicated Railway
LUO Hong-Ban
2007, 27(增刊1): 30-32,39
DOI:
B
Abstract
(
1870
)
PDF
(659KB) (
1265
)
Causes and Countermeasures for Construction Cracks on
Pumped Concrete Structures of Tunnels
JIA Fu-Kui
2007, 27(增刊1): 33-35
DOI:
B
Abstract
(
1747
)
PDF
(324KB) (
1192
)
Construction Countermeasures for Hongshiyan Tunnel: a Gas
Tunnel on Passengerdedicated Railway
LIANG Dong, LIAO Zhen-Fang
2007, 27(增刊1): 36-39
DOI:
B
Abstract
(
1927
)
PDF
(546KB) (
1711
)
Optimization of Shaft Station for Trackless Transportation
and Roof Ripping Construction Technology
DIAO Yong
2007, 27(增刊1): 40-42
DOI:
B
Abstract
(
1709
)
PDF
(903KB) (
1347
)
Waterproofing and Drainage Construction Technology for Hongshiyan
Tunnel on Passengerdedicated Railway
LIANG Dong, LIAO Zhen-Fang
2007, 27(增刊1): 43-46
DOI:
B
Abstract
(
1925
)
PDF
(715KB) (
1172
)
Causes and Prevention Measures for Cracks on Bulk Concrete Structures:
Case Study on Bridge Works on Hefei~Wuhan Railway
ZHANG Li
2007, 27(增刊1): 47-48,82
DOI:
B
Abstract
(
1598
)
PDF
(525KB) (
1196
)
Invert Construction Technology by means of Invert Trestles: Case Study on
Working Lot of No. 8 Inclined Shaft of Taihangshan Tunnel
WANG Jun-Chao
2007, 27(增刊1): 49-51
DOI:
B
Abstract
(
1959
)
PDF
(439KB) (
1888
)
Optimization of Transportation System of Working Lot of
No. 7 Inclined Shaft of Taihangshan Tunnel
CHEN Jun, SHI Sai-Feng
2007, 27(增刊1): 52-54
DOI:
B
Abstract
(
2058
)
PDF
(949KB) (
1493
)
Rapid Construction Technology and Management of Steep
Inclined Shaft with Small CrossSection
MAO Jun
2007, 27(增刊1): 55-58
DOI:
B
Abstract
(
1731
)
PDF
(585KB) (
1033
)
Application of Technology of Assembled Formworks with Interior
Scaffolds and exteriorlyhung Scaffolds in Construction of
Bridges on Passengerdedicated Railways
SHU Yan-Wei
2007, 27(增刊1): 59-61,69
DOI:
B
Abstract
(
1365
)
PDF
(1535KB) (
987
)
Excavation Settingout of Passengerdedicated
Railway Tunnels with Large Crosssections
DU Fa-Beng
2007, 27(增刊1): 62-64
DOI:
B
Abstract
(
1866
)
PDF
(302KB) (
1172
)
Gas Monitoring Technology Applied in Exit Lot of Hongshiyan Tunnel
LIU Dan-Lei
2007, 27(增刊1): 65-69
DOI:
B
Abstract
(
1630
)
PDF
(1083KB) (
1212
)
Gascontrol Construction Ventilation for Exit Section of Hongshiyan Tunnel
HUANG Zhen-Hua
2007, 27(增刊1): 70-72
DOI:
B
Abstract
(
1639
)
PDF
(390KB) (
1270
)
Application of Hazard Source Identification in Design
Change of Inclined Shaft of Changlinguan Tunnel
LI Bei, LUO Qiong, SUN Zhao-Yuan, TU Lei, JIAO Cang, HE Jian
2007, 27(增刊1): 73-75,79
DOI:
B
Abstract
(
2522
)
PDF
(644KB) (
1749
)
Countermeasures for Problems in Material
Management of Construction Works
MA Xiang-Yang
2007, 27(增刊1): 76-79
DOI:
B
Abstract
(
1632
)
PDF
(353KB) (
1209
)
Management of Rapid Construction of Tunnels on
Passengerdedicated Railways
TUN Zhi-Gang, WANG Jun-Chao
2007, 27(增刊1): 80-82
DOI:
B
Abstract
(
1976
)
PDF
(412KB) (
978
)
Quality Control on Passengerdedicated Railway Tunnels
LAN Xiao-Jiang
2007, 27(增刊1): 83-85
DOI:
B
Abstract
(
1870
)
PDF
(326KB) (
991
)
Mixing of Durable Concrete for Lining of
Passengerdedicated Railway Tunnels
BAI Wen-Liang
2007, 27(增刊1): 86-87,91
DOI:
B
Abstract
(
1744
)
PDF
(512KB) (
932
)
Construction Cost Control of Passengerdedicated Railways
ZHENG Chao-Wei
2007, 27(增刊1): 88-91
DOI:
B
Abstract
(
1620
)
PDF
(342KB) (
1051
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat