Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2007, 27 (2) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Advance Geology Prediction Technology Applied during
Construction of Karst Tunnels on Yi-Wan Railway
LIU Ru-Chen
2007, 27(2): 1-3,35
DOI:
B
Abstract
(
1838
)
PDF
(1778KB) (
1307
)
Actuality and Prospects of Construction Techniques
of Urban Traffic Tunnels in Guangzhou
WEI Li-Xin, LIU Fang, CHEN Yan-Beng
2007, 27(2): 4-8
DOI:
A
Abstract
(
2167
)
PDF
(607KB) (
958
)
Case Study on Traveling Speed and Structure Gauge of
Yangtze River Crossing Shield Tunnels
DING Gao, JIANG Shu-Bing, GONG Pan-Feng
2007, 27(2): 9-11,31
DOI:
B
Abstract
(
2135
)
PDF
(571KB) (
954
)
3D FEM Regressive Analysis of Insitu Geostress Field and Its Application
WANG Bang-Qun, LIU Han-Dong
2007, 27(2): 12-15,39
DOI:
A
Abstract
(
1571
)
PDF
(1312KB) (
1116
)
Development Technology for Survey and Control
Systems of Articulated EPB Shield Machines
SUN Lian
2007, 27(2): 16-20
DOI:
A
Abstract
(
1822
)
PDF
(2025KB) (
803
)
Type Selection of Shield Machines for Beijing Rail Underground Transit Line
ZHANG Shuang-E
2007, 27(2): 21-23,46
DOI:
B
Abstract
(
2448
)
PDF
(1284KB) (
1570
)
Analysis on Effect of Pipe Forepoling Installed for Asymmetricallyloaded
Sections of Doublearch Tunnels: Case Study on Fuxi Tunnel in China
CAO Guang-Lun, XU An-Cheng, DUAN Hai-Peng, LIU Bao-Guo
2007, 27(2): 24-27,39
DOI:
A
Abstract
(
2013
)
PDF
(2462KB) (
1110
)
Analysis on Impact of Inclined Hoisting Shaft of Moxinpo Coal Mine on
Corresponding Section of Xiangfan—Chongqing Railway
LIU Jie-Lun, XIE Qi-Jian
2007, 27(2): 28-31
DOI:
A
Abstract
(
1975
)
PDF
(1854KB) (
924
)
Analysis on Deformation of Large Crosssection Tunnels
Constructed by Side Drift Method
GAO Jun
2007, 27(2): 32-35
DOI:
B
Abstract
(
1966
)
PDF
(2215KB) (
870
)
Dynamic Analysis on Construction of Large Crosssection
Tunnel Adjacent to Existing Metro Line
WANG Gang
2007, 27(2): 36-39
DOI:
B
Abstract
(
1959
)
PDF
(1159KB) (
1041
)
Analysis on Factors Affecting Deformation of Adjacent Buildings Caused by
Construction of Deep Foundation Pit in Soft Ground and Countermeasures
ZHOU Pan-Jun
2007, 27(2): 40-43
DOI:
B
Abstract
(
1893
)
PDF
(980KB) (
870
)
Static Experiment on 32m Doubletrack Precast Box Girders for
Passenger Dedicated Railway Bridge with Ballasted Tracks
DU Xiang-Bin, Bie-Da-Hua
2007, 27(2): 44-46
DOI:
B
Abstract
(
1667
)
PDF
(615KB) (
1276
)
Verification Calculation of Allowable Tensile Strain of Bottom
Surface of Asphalt Concrete Pavements
HE Ning
2007, 27(2): 47-49,53
DOI:
B
Abstract
(
1690
)
PDF
(1022KB) (
1655
)
Selection of Construction Program for Zhou’aodi
Underground Passage Project
LIAO Jun, XIE Yong, Gao-Xiang
2007, 27(2): 50-53
DOI:
B
Abstract
(
1851
)
PDF
(1350KB) (
985
)
Design of Diaphragm Wall Retaining Structure of Fanhu Station on
Wuhan Mass Rapid Transit (MRT) System
AI Chi-Jia, He-Zhen-Hua, Li-Zhong
2007, 27(2): 54-56,63
DOI:
B
Abstract
(
2150
)
PDF
(2133KB) (
1236
)
Dynamic Feedback Construction Technology for Shallowburied
Soft Ground Tunnels with Large Spans
GAO Jun, LI Jian-Hua
2007, 27(2): 57-59,95
DOI:
B
Abstract
(
1835
)
PDF
(830KB) (
881
)
Stepbystep and Layerbylayer Dewatering
Technology for Saturated Fine Silty Sand Ground
BAI Ju-Min
2007, 27(2): 60-63
DOI:
B
Abstract
(
2963
)
PDF
(763KB) (
901
)
Construction Technology for Extradeep Diaphragm Walls and
Countermeasures of Usual Problems
CHENG Rui-Meng, FU Xiao-Gang
2007, 27(2): 64-67,82
DOI:
B
Abstract
(
2194
)
PDF
(1401KB) (
1300
)
Protection of Underground Utilities during Construction of
Urban Underground Works
HUANG Cong-Gang
2007, 27(2): 68-71
DOI:
B
Abstract
(
2117
)
PDF
(733KB) (
1021
)
Construction Technology for Consolidation of Road Channel Side Slopes by
means of Prestressed Anchoring Cables and Concrete Frames
FAN Xiong-Gui
2007, 27(2): 72-74
DOI:
B
Abstract
(
1830
)
PDF
(483KB) (
903
)
Construction and Test of Deep Cement Mixing
Piles for Soft Foundations of Highways
ZHANG Kai
2007, 27(2): 75-77,98
DOI:
B
Abstract
(
1719
)
PDF
(562KB) (
985
)
Construction Technology for Geogrid Reinforced Earth Retaining Walls for
Subgrade in Plateau Wetland: Case Study on QinghaiTibet Railway
JI Wei, YI Jian-Wen, ZHENG Qing-Jun
2007, 27(2): 78-82
DOI:
B
Abstract
(
1852
)
PDF
(601KB) (
1239
)
Construction Technology for Treatment of Soft Railway Subgrade Foundations by means of CFG Piles
LI Zhi-Qing, Zhi-Chang-Ying
2007, 27(2): 83-84,92
DOI:
B
Abstract
(
1790
)
PDF
(614KB) (
965
)
Application of “Prestressed Concrete Pipe Pile + Geocell&rdquo|in Consolidation of Soft Subgrades of Passengerdedicated Railways
LIN Zhi-Xiang
2007, 27(2): 85-87
DOI:
B
Abstract
(
1428
)
PDF
(942KB) (
775
)
Prefabrication and Installation Technology for Steel Box
Girders of a Highway Cloverleaf Crossing
DONG Kui-Wu
2007, 27(2): 88-92
DOI:
B
Abstract
(
1677
)
PDF
(612KB) (
1200
)
Discussions on Snow Removing Technology for Highways
ZHOU Xiu-Min, Zhang-Jie-Xiao
2007, 27(2): 93-95
DOI:
B
Abstract
(
1730
)
PDF
(467KB) (
983
)
Reforms on Internal Auditing Systems of Stateowned
Mediumlarge Enterprises of China
YI Kun
2007, 27(2): 96-98
DOI:
A
Abstract
(
1409
)
PDF
(333KB) (
861
)
Comments on Equity Financing Preference of China’s Enterprises
HU Xiao-Duan
2007, 27(2): 99-101
DOI:
B
Abstract
(
1560
)
PDF
(341KB) (
1089
)
Comments on Marketing and Bidding Management of
Construction Enterprises
NA Xiao-Yu
2007, 27(2): 102-104
DOI:
C
Abstract
(
2125
)
PDF
(339KB) (
985
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat