Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2007, 27 (3) Published: 20 June 2007
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Comments on Some Engineering and Technology Issues
Related to Building Subsea Tunnels in China
GUO Shan-Yun
2007, 27(3): 1-5
DOI:
B
Abstract
(
1871
)
PDF
(410KB) (
1989
)
Mechanisms Study and Case Analysis on Detection of Geological Body (Karst Cave) by means of Geological Radar
DIAO Yu-Liang, Li-Jian-Hua
2007, 27(3): 6-9
DOI:
A
Abstract
(
1725
)
PDF
(4854KB) (
1364
)
Trial Study on Tunnel Construction by means of Milling Excavation Method
LEI Xiang-Feng
2007, 27(3): 10-12,46
DOI:
B
Abstract
(
1687
)
PDF
(993KB) (
1194
)
Analysis on Karst Water Inflow Mechanisms and Determination of
Thickness of Safe Rock Walls: Case Study on a Tunnel
AN Hun-Rong, YANG Yi, LI Jian-She
2007, 27(3): 13-16,50
DOI:
A
Abstract
(
1929
)
PDF
(1500KB) (
1096
)
BP Neural Network Prediction of Surface
Settlement Resulted by Shield Tunneling
HOU Chi-Dong
2007, 27(3): 17-20
DOI:
B
Abstract
(
1843
)
PDF
(369KB) (
899
)
Discussion on Some Problems in Chamber Blasting Design
HAO Fei
2007, 27(3): 21-23
DOI:
A
Abstract
(
1612
)
PDF
(327KB) (
797
)
Probes into Control Technologies for Cracks of Huge
Concrete Segments during Manufacturing
YANG De-Xi, Wang-Chao-Feng
2007, 27(3): 24-27
DOI:
A
Abstract
(
2194
)
PDF
(780KB) (
1175
)
Monitoring and Analysis of Axial forces of Steel Supports of a
Foundation Pit of Shenyang Metro Works
WANG Hua-Jun
2007, 27(3): 28-30
DOI:
B
Abstract
(
2125
)
PDF
(776KB) (
1190
)
Stateoftheart of Researches on Doublearch Tunnels in Mountainous Area
JIAN Wen-Fei, WANG Yong, LIU Hong-Zhou, WANG Ting-Ba
2007, 27(3): 31-34
DOI:
B
Abstract
(
2134
)
PDF
(862KB) (
1129
)
Application and Analysis of Cover Systems of Cut and Cover
Metro Stations Assembled by Military Beams
LIU Hui
2007, 27(3): 35-39
DOI:
A
Abstract
(
1804
)
PDF
(2349KB) (
1386
)
Discussions on Durability of Concrete Structures
LI Feng-Rong
2007, 27(3): 40-42
DOI:
A
Abstract
(
1645
)
PDF
(340KB) (
980
)
Design of Final Joint of Shengwudao~Daxuecheng Immersed Tunnel
LIU Jian-Fei
2007, 27(3): 43-46
DOI:
B
Abstract
(
1874
)
PDF
(1104KB) (
1573
)
Design of Doublearch Opencut Extralarge Span Tunnel for Hechuan Station
PAN Chao
2007, 27(3): 47-50
DOI:
B
Abstract
(
1682
)
PDF
(517KB) (
706
)
Design of Solutions for Shielddriven Running Tunnel Crossing Bridge Piles:
Case Study on a Shielddriven Running Tunnel on Line 1
of Suzhou Mass Rapid Transit (MRT) System
LIU Yong, HE Zhen-Hua, LI Zhong
2007, 27(3): 51-55
DOI:
B
Abstract
(
2668
)
PDF
(3244KB) (
924
)
Major ConstructionDifficulties of and Solutions for Construction of
Fenghuoshan Tunnel on Qinghai~Tibet Railway
HU Jing-Feng
2007, 27(3): 56-58,104
DOI:
B
Abstract
(
2276
)
PDF
(716KB) (
1557
)
Construction Technology for Tunnel Sections Passing through Superhuge
Karst Collapse Accumulation Body: Case Study on Yesanguan Tunnel
ZHANG Shun-Zhong
2007, 27(3): 59-61
DOI:
B
Abstract
(
1996
)
PDF
(841KB) (
1083
)
Application of Pressure Prestressed Anchoring Cables in
Underground Caverns with Large Spans and High Side Walls
QIU Fu-Jun, Yang-Gui-Hao
2007, 27(3): 62-64,100
DOI:
B
Abstract
(
1618
)
PDF
(927KB) (
1151
)
Horizontal Control Survey inside Long Cutthrough Tunnel
DU Dao-Long
2007, 27(3): 65-66,114
DOI:
B
Abstract
(
2568
)
PDF
(480KB) (
1691
)
Causes for and Treatment of Vault Collapse of No. 1 Fanjialing Tunnel
JIANG Jie
2007, 27(3): 67-70,87
DOI:
B
Abstract
(
1778
)
PDF
(1801KB) (
1368
)
Key Construction Technologies and Countermeasures for
Largescale Mined Interchange Metro Stations
CHEN Chao, DONG Xiao-Long
2007, 27(3): 71-74,91
DOI:
B
Abstract
(
1663
)
PDF
(1001KB) (
946
)
Construction Technology for Shield Boring across Flood Control Walls
ZHANG Su
2007, 27(3): 75-78
DOI:
B
Abstract
(
1576
)
PDF
(1390KB) (
1004
)
Treatment Technology for Portal Section of Twintube Soft Ground
Tunnel with Largespan and Smallspacing
HUANG Xin-She, CAO Zheng-Chi
2007, 27(3): 79-83
DOI:
B
Abstract
(
2039
)
PDF
(1394KB) (
990
)
Construction Technology of Jet Grouting
Piles Applied in Urban Metro Works
LIANG Yun-Sheng
2007, 27(3): 84-87
DOI:
B
Abstract
(
1781
)
PDF
(599KB) (
1007
)
Highspeed Fullface Construction Technology for Dayaoshan
Passengerdedicated Railway Tunnel
DONG Dao-Hai
2007, 27(3): 88-91
DOI:
B
Abstract
(
2023
)
PDF
(869KB) (
1076
)
Construction of Tunnel in Compact Waterrich Sandpebble
Ground by means of Shallow Undercutting Method
CUI Ying-Zhe, DANG Gong-Zhang, DAI Xun-Hua
2007, 27(3): 92-96
DOI:
B
Abstract
(
2226
)
PDF
(2459KB) (
1158
)
Application of Optic Fiber Monitoring Technology in Metro Works
TU Si-Gong
2007, 27(3): 97-100
DOI:
B
Abstract
(
1571
)
PDF
(1485KB) (
1100
)
Application of Gallery Ventilation in Construction of Motianling Tunnel
FAN Jin-Jiang
2007, 27(3): 101-104
DOI:
B
Abstract
(
1742
)
PDF
(647KB) (
1132
)
Waterproofing and Drainage Construction
Technology for Lining of Jinjishan Tunnel
TAO Li-Zhen
2007, 27(3): 105-107
DOI:
B
Abstract
(
1736
)
PDF
(1166KB) (
1142
)
Problems and Countermeasures for Tunnel Construction by
Doubleshielded TBMs in Adverse Geological Conditions
LIN Guo-Jing
2007, 27(3): 108-111
DOI:
A
Abstract
(
2157
)
PDF
(1271KB) (
2280
)
Comparative Analysis on Two Types of Steering
Systems of Wheeled Project Vehicles
ZHANG Chun-Ling
2007, 27(3): 112-114
DOI:
B
Abstract
(
1383
)
PDF
(377KB) (
1127
)
Problems and Countermeasures for Mechanical Equipment
Management of Construction Enterprises
QIN Yu-Ping
2007, 27(3): 115-117
DOI:
B
Abstract
(
1614
)
PDF
(324KB) (
1334
)
Brief Analysis on Project Bidding Strategy and Quotation Skills
ZHOU Yuan-Yuan
2007, 27(3): 118-120
DOI:
C
Abstract
(
1540
)
PDF
(326KB) (
1487
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat