Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (增刊2) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Study on Numerical Simulations of Performance
of Tunnel Boring Machines (TBM)
ZHANG Hou-Mei
2006, 26(增刊2): 1-7
DOI:
A
Abstract
(
1923
)
PDF
(685KB) (
1436
)
Experimental Study on Insitu Monitoring of Ground
Pressures Acting on Shielddriven Tunnels
ZHANG Hou-Mei, ZHANG Liang-Hui, MA An-Zhou
2006, 26(增刊2): 8-11,46
DOI:
A
Abstract
(
1938
)
PDF
(915KB) (
1383
)
Qualifications for Boulder Breaking by Shield
Machines and Pretreatment of Boulders
GU Li
2006, 26(增刊2): 12-13,22
DOI:
B
Abstract
(
1696
)
PDF
(562KB) (
1804
)
Results of and Analysis on Monitoring for Construction of
Foundation Pits of Shield Machine Launching Shafts
LI Qi-Sen, Tun-Xiu-Guo, Zhang-Hou-Mei
2006, 26(增刊2): 14-18
DOI:
B
Abstract
(
2043
)
PDF
(802KB) (
1279
)
Survey Model of Attitude Control Points of Shield
Machines and its Application
LI Guo-Hua
2006, 26(增刊2): 19-22
DOI:
B
Abstract
(
2060
)
PDF
(467KB) (
1342
)
Discussion on Survey Technology for Improving Holingthrough
Accuracy of Shieldbored Tunnels
SHU Hong-Meng
2006, 26(增刊2): 23-26
DOI:
A
Abstract
(
1973
)
PDF
(345KB) (
1306
)
Analysis on Control Survey of Long Metro Tunnels
JU Yong
2006, 26(增刊2): 27-29
DOI:
B
Abstract
(
1675
)
PDF
(306KB) (
1286
)
Buildings/structures Protection Technology during Construction of Shieldbored Tunnels
TUN Xiang-Zhou
2006, 26(增刊2): 30-32
DOI:
B
Abstract
(
1956
)
PDF
(489KB) (
1119
)
Application of New Construction Technologies in ChiLu Running Tunnel Works on Line 2 of Guangzhou Metro
XIE Jun-Liang, Zhang-Liang-Hui, Yang-Xiao-Beng
2006, 26(增刊2): 33-36
DOI:
B
Abstract
(
2212
)
PDF
(972KB) (
1252
)
Construction Technology for Large Crosssection Connection
Tunnels of Shielddriven Tunnels
LIANG Xin-Piao
2006, 26(增刊2): 37-38
DOI:
B
Abstract
(
1948
)
PDF
(321KB) (
1031
)
Application of Blasting Technology in Relieving of Blocked Shield Machines
YAN Gong-Wei
2006, 26(增刊2): 39-40,55
DOI:
B
Abstract
(
1581
)
PDF
(692KB) (
1397
)
Quality Control of Segment Erection of Shielddriven Metro Tunnels
TUN Lei
2006, 26(增刊2): 41-43
DOI:
B
Abstract
(
1913
)
PDF
(420KB) (
2184
)
Construction Technology for Shield Boring through Fractured Zones
CENG Wei-Hua
2006, 26(增刊2): 44-46
DOI:
B
Abstract
(
1650
)
PDF
(596KB) (
1289
)
Tunnel Boring across underneath Highspeed Railways by Shield Machines
LIU Yang-Cheng
2006, 26(增刊2): 47-49,84
DOI:
B
Abstract
(
1863
)
PDF
(854KB) (
1371
)
Countermeasures for Segment Uplifting in Shield Tunnel Construction
WEI Xin
2006, 26(增刊2): 50-51
DOI:
B
Abstract
(
1909
)
PDF
(383KB) (
1216
)
Effect of Shield Tail Sealing in Prevention of Mortar Leakages
ZHANG Fu-Min
2006, 26(增刊2): 52-55
DOI:
B
Abstract
(
1560
)
PDF
(721KB) (
2483
)
Safety Control for Tunnel Boring Construction by Shield Machines
ZHANG Lei
2006, 26(增刊2): 56-58,68
DOI:
B
Abstract
(
1896
)
PDF
(555KB) (
1179
)
Construction Quality Defects of Shield Tunnels
LIU Shu-Quan
2006, 26(增刊2): 59-61,80
DOI:
B
Abstract
(
1816
)
PDF
(567KB) (
1234
)
Safety Control of Transportation Systems of Tunnel
Construction by EPB Shield Machines
HU Zhi-Guang
2006, 26(增刊2): 62-64,74
DOI:
B
Abstract
(
1751
)
PDF
(737KB) (
1213
)
Cutter Wearing Predictions during Boring of Shield Machines
MA An-Zhou
2006, 26(增刊2): 65-68
DOI:
B
Abstract
(
1700
)
PDF
(601KB) (
1909
)
Reforming of Foam System of an EPB Shield Machine
Manufactured by Mitsubishi Heavy Industries
YANG Can
2006, 26(增刊2): 69-71
DOI:
B
Abstract
(
1979
)
PDF
(500KB) (
1238
)
Development of Chinesemade Inclinometer System for Attitude Control
of Shield Machines Manufactured by Mitsubishi Heavy Industries
YANG Can
2006, 26(增刊2): 72-74
DOI:
B
Abstract
(
1665
)
PDF
(327KB) (
1146
)
Application and Parametertuning Methods of Automatic Compressed
Air Supply Systems of Shield Machines
TUN Qi-Yi, LIN Jin-Hong
2006, 26(增刊2): 75-76,80
DOI:
B
Abstract
(
1854
)
PDF
(689KB) (
1241
)
Causes for Wearing of Disc Cutters of Shield
Machines in Mixed Ground and Countermeasures
LIU Xiao-Yi
2006, 26(增刊2): 77-80
DOI:
B
Abstract
(
1720
)
PDF
(428KB) (
1651
)
Differences between S244 Shield Machine Manufactured by Herrenknecht
AG. and No. 1638 Shield Machine Manufactured by Mitsubishi
Heavy Industries, Ltd. in terms of Tunnel Construction
KANG Wei-Gang
2006, 26(增刊2): 81-84
DOI:
B
Abstract
(
2102
)
PDF
(479KB) (
1684
)
Technology for Separate Launching of Shield Machines
YANG Re
2006, 26(增刊2): 85-87
DOI:
B
Abstract
(
1668
)
PDF
(1313KB) (
1707
)
Technology for Replacement of Sealing Brushes of Shield Machines
Manufactured by Mitsubishi Heavy Industries Ltd. in Ground with Rich Water
LIU Yang-Sheng
2006, 26(增刊2): 88-90
DOI:
B
Abstract
(
1678
)
PDF
(736KB) (
1278
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat