Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (增刊2) Published: 18 December 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Study on Numerical Simulations of Performance
of Tunnel Boring Machines (TBM)
ZHANG Hou-Mei
2006, 26(增刊2): 1-7
DOI:
A
Abstract
(
1911
)
PDF
(685KB) (
1403
)
Experimental Study on Insitu Monitoring of Ground
Pressures Acting on Shielddriven Tunnels
ZHANG Hou-Mei, ZHANG Liang-Hui, MA An-Zhou
2006, 26(增刊2): 8-11,46
DOI:
A
Abstract
(
1918
)
PDF
(915KB) (
1360
)
Qualifications for Boulder Breaking by Shield
Machines and Pretreatment of Boulders
GU Li
2006, 26(增刊2): 12-13,22
DOI:
B
Abstract
(
1681
)
PDF
(562KB) (
1783
)
Results of and Analysis on Monitoring for Construction of
Foundation Pits of Shield Machine Launching Shafts
LI Qi-Sen, Tun-Xiu-Guo, Zhang-Hou-Mei
2006, 26(增刊2): 14-18
DOI:
B
Abstract
(
2022
)
PDF
(802KB) (
1271
)
Survey Model of Attitude Control Points of Shield
Machines and its Application
LI Guo-Hua
2006, 26(增刊2): 19-22
DOI:
B
Abstract
(
2033
)
PDF
(467KB) (
1337
)
Discussion on Survey Technology for Improving Holingthrough
Accuracy of Shieldbored Tunnels
SHU Hong-Meng
2006, 26(增刊2): 23-26
DOI:
A
Abstract
(
1961
)
PDF
(345KB) (
1251
)
Analysis on Control Survey of Long Metro Tunnels
JU Yong
2006, 26(增刊2): 27-29
DOI:
B
Abstract
(
1659
)
PDF
(306KB) (
1273
)
Buildings/structures Protection Technology during Construction of Shieldbored Tunnels
TUN Xiang-Zhou
2006, 26(增刊2): 30-32
DOI:
B
Abstract
(
1921
)
PDF
(489KB) (
1107
)
Application of New Construction Technologies in ChiLu Running Tunnel Works on Line 2 of Guangzhou Metro
XIE Jun-Liang, Zhang-Liang-Hui, Yang-Xiao-Beng
2006, 26(增刊2): 33-36
DOI:
B
Abstract
(
2184
)
PDF
(972KB) (
1240
)
Construction Technology for Large Crosssection Connection
Tunnels of Shielddriven Tunnels
LIANG Xin-Piao
2006, 26(增刊2): 37-38
DOI:
B
Abstract
(
1927
)
PDF
(321KB) (
997
)
Application of Blasting Technology in Relieving of Blocked Shield Machines
YAN Gong-Wei
2006, 26(增刊2): 39-40,55
DOI:
B
Abstract
(
1559
)
PDF
(692KB) (
1309
)
Quality Control of Segment Erection of Shielddriven Metro Tunnels
TUN Lei
2006, 26(增刊2): 41-43
DOI:
B
Abstract
(
1901
)
PDF
(420KB) (
2168
)
Construction Technology for Shield Boring through Fractured Zones
CENG Wei-Hua
2006, 26(增刊2): 44-46
DOI:
B
Abstract
(
1633
)
PDF
(596KB) (
1267
)
Tunnel Boring across underneath Highspeed Railways by Shield Machines
LIU Yang-Cheng
2006, 26(增刊2): 47-49,84
DOI:
B
Abstract
(
1850
)
PDF
(854KB) (
1354
)
Countermeasures for Segment Uplifting in Shield Tunnel Construction
WEI Xin
2006, 26(增刊2): 50-51
DOI:
B
Abstract
(
1894
)
PDF
(383KB) (
1201
)
Effect of Shield Tail Sealing in Prevention of Mortar Leakages
ZHANG Fu-Min
2006, 26(增刊2): 52-55
DOI:
B
Abstract
(
1547
)
PDF
(721KB) (
2414
)
Safety Control for Tunnel Boring Construction by Shield Machines
ZHANG Lei
2006, 26(增刊2): 56-58,68
DOI:
B
Abstract
(
1879
)
PDF
(555KB) (
1078
)
Construction Quality Defects of Shield Tunnels
LIU Shu-Quan
2006, 26(增刊2): 59-61,80
DOI:
B
Abstract
(
1797
)
PDF
(567KB) (
1212
)
Safety Control of Transportation Systems of Tunnel
Construction by EPB Shield Machines
HU Zhi-Guang
2006, 26(增刊2): 62-64,74
DOI:
B
Abstract
(
1743
)
PDF
(737KB) (
1134
)
Cutter Wearing Predictions during Boring of Shield Machines
MA An-Zhou
2006, 26(增刊2): 65-68
DOI:
B
Abstract
(
1677
)
PDF
(601KB) (
1886
)
Reforming of Foam System of an EPB Shield Machine
Manufactured by Mitsubishi Heavy Industries
YANG Can
2006, 26(增刊2): 69-71
DOI:
B
Abstract
(
1968
)
PDF
(500KB) (
1222
)
Development of Chinesemade Inclinometer System for Attitude Control
of Shield Machines Manufactured by Mitsubishi Heavy Industries
YANG Can
2006, 26(增刊2): 72-74
DOI:
B
Abstract
(
1645
)
PDF
(327KB) (
1123
)
Application and Parametertuning Methods of Automatic Compressed
Air Supply Systems of Shield Machines
TUN Qi-Yi, LIN Jin-Hong
2006, 26(增刊2): 75-76,80
DOI:
B
Abstract
(
1829
)
PDF
(689KB) (
1220
)
Causes for Wearing of Disc Cutters of Shield
Machines in Mixed Ground and Countermeasures
LIU Xiao-Yi
2006, 26(增刊2): 77-80
DOI:
B
Abstract
(
1708
)
PDF
(428KB) (
1636
)
Differences between S244 Shield Machine Manufactured by Herrenknecht
AG. and No. 1638 Shield Machine Manufactured by Mitsubishi
Heavy Industries, Ltd. in terms of Tunnel Construction
KANG Wei-Gang
2006, 26(增刊2): 81-84
DOI:
B
Abstract
(
2085
)
PDF
(479KB) (
1671
)
Technology for Separate Launching of Shield Machines
YANG Re
2006, 26(增刊2): 85-87
DOI:
B
Abstract
(
1654
)
PDF
(1313KB) (
1678
)
Technology for Replacement of Sealing Brushes of Shield Machines
Manufactured by Mitsubishi Heavy Industries Ltd. in Ground with Rich Water
LIU Yang-Sheng
2006, 26(增刊2): 88-90
DOI:
B
Abstract
(
1664
)
PDF
(736KB) (
1269
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat