Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (5) Published: 20 October 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Outline of Tunnel Construction by means of Method of Undercutting with Shallow Overburden
WANG Meng-Shu
2006, 26(5): 1-4
DOI:
B
Abstract
(
2334
)
PDF
(646KB) (
1748
)
Effects of Pensile Curtains on Dewatering of Foundation Pits
LEI Zhi-Jiang, Feng-Xiao-La, WANG Chao-Feng
2006, 26(5): 5-7,20
DOI:
A
Abstract
(
1714
)
PDF
(948KB) (
1310
)
ANSYS Method for Deduction of Parameters
of Equivalent Circular Zone of Shield Tunnel
ZHANG Hong-Zhou, Zhang-Jin-Wei, Di-Jian-Hua
2006, 26(5): 8-10,27
DOI:
A
Abstract
(
2006
)
PDF
(813KB) (
1493
)
Discussions on Criteria for Soil Reinforcement during EPB
Shields&rsquo|Launching &|Arrival Construction in Soft Ground
HU Xin-Peng, SUN Mou, WANG Dun-Lan
2006, 26(5): 11-13
DOI:
A
Abstract
(
1807
)
PDF
(428KB) (
1077
)
Research on Reliability of Ultimate Bearing Capacity of Threedimensional
Rectangular Foundations under Complicated Loading Conditions
ZHENG Ai-Yuan
2006, 26(5): 14-16
DOI:
A
Abstract
(
1791
)
PDF
(280KB) (
837
)
Analysis on Internal Forces and Deformations of Surrounding
Rock Mass during Excavation of a Largespanned Tunnel
BA Fang
2006, 26(5): 17-20
DOI:
A
Abstract
(
1694
)
PDF
(494KB) (
933
)
Prevention of AlkaliAggregate Reaction in Concrete
CHANG Xiang
2006, 26(5): 21-23,33
DOI:
A
Abstract
(
1401
)
PDF
(586KB) (
1242
)
tudy on Control Measures for Differential Settlement between
Newlybuilt Structures and Existing Structures during
Renovation of Existing Line of Tianjin Metro
JU Yu
2006, 26(5): 24-27
DOI:
A
Abstract
(
2032
)
PDF
(549KB) (
856
)
Evaluation on Sand Liquefaction of Subgrade of DezhouShangqiu
Highway in Fan County, Henan Province
GENG Yong-Jiang
2006, 26(5): 28-30,46
DOI:
A
Abstract
(
1355
)
PDF
(573KB) (
1106
)
Analysis on Effects of Side Drifts in Construction of Largespan Tunnels
HUANG Shu-Lin, Zhang-Zhi-Jiang
2006, 26(5): 31-33
DOI:
A
Abstract
(
1672
)
PDF
(540KB) (
1044
)
Analysis on Difficulties and Risks in Construction of Qingchun
Road Rivercrossing Tunnel and Their Countermeasures
GAO Jun, JIAN Jian-Wen
2006, 26(5): 34-36,40
DOI:
B
Abstract
(
1751
)
PDF
(974KB) (
1394
)
Design and Construction of Waterproofing
and Drainage of Kunlunshan Tunnel
YAN Wei
2006, 26(5): 37-40
DOI:
B
Abstract
(
1725
)
PDF
(609KB) (
1069
)
Design of Undercut Rectangular Tunnel with Supershallow Overburden
ZHANG Zhe-Jiang
2006, 26(5): 41-42,46
DOI:
B
Abstract
(
2017
)
PDF
(726KB) (
1230
)
Stability Analysis and Treatment of Landslide
at Entrance Portal of Yunling Tunnel
FAN Jian-Hai, Fu-Zheng-Fei, He-Yu-Qing, WANG Yuan-Han
2006, 26(5): 43-46
DOI:
A
Abstract
(
1859
)
PDF
(695KB) (
1007
)
Blasting Vibration Monitoring and Control Technology
Applied in Construction of Huaishuping Tunnel
GUO Han-Chao
2006, 26(5): 47-49,78
DOI:
B
Abstract
(
1778
)
PDF
(685KB) (
1379
)
Construction of Laoyachong Tunnel across underneath
Highway with Shallow Overburden
HE Jian-Duan
2006, 26(5): 50-52
DOI:
B
Abstract
(
1900
)
PDF
(390KB) (
1000
)
Construction Technology for Tunnel Section in Gypsum Geology
SUN Guo-Qiang
2006, 26(5): 53-55
DOI:
B
Abstract
(
1523
)
PDF
(396KB) (
939
)
Analysis on Cracks of Largescale Segments for Shielddriven Tunnels
SONG Shu-Xian
2006, 26(5): 56-59,73
DOI:
B
Abstract
(
1703
)
PDF
(993KB) (
1205
)
Analysis on and Countermeasures for Collapse in
Weak Ground Section of Huocheling Tunnel
DONG Shi-Qi, MAO Meng
2006, 26(5): 60-62
DOI:
B
Abstract
(
1825
)
PDF
(366KB) (
968
)
PileBeamArch (PBA) |Construction Technology for Mined Metro Stations
SHU Ze-Min
2006, 26(5): 63-65,100
DOI:
B
Abstract
(
1725
)
PDF
(805KB) (
1991
)
Construction of Longfeng Tunnel Penetrating
across underneath Existing Jianshanzi Tunnel
FU Jiang, ZHANG Xi-Bao
2006, 26(5): 66-69
DOI:
B
Abstract
(
1915
)
PDF
(558KB) (
1072
)
Application of Sleevevalve Pipe Grouting Technology in
Consolidation of Highway Subgrade Works
ZHANG Wen-Jiang
2006, 26(5): 70-73
DOI:
B
Abstract
(
1401
)
PDF
(564KB) (
1714
)
Application of “Prestressed Anchor Cable + Antislide
Pile&rdquo|Method in Treatment of Landslides
HAO Yi-Feng
2006, 26(5): 74-75,87
DOI:
B
Abstract
(
1248
)
PDF
(609KB) (
933
)
Rebar Cages and Connection Piles Hoisting
Technology in Diaphragm Wall Construction
AO Hai-Bei, Fan-Xiong-Gui
2006, 26(5): 76-78
DOI:
B
Abstract
(
1805
)
PDF
(403KB) (
1236
)
Construction Equipment Matching of a Largescale
Earth/rock Engineering Works in Shenzhen
HE Zhen-Guo
2006, 26(5): 79-81,96
DOI:
B
Abstract
(
1297
)
PDF
(1028KB) (
1727
)
Asphalt Concrete Pavement Construction Technology for Highway Works
LIN Pan-Feng, Wang-Gang-Xiong
2006, 26(5): 82-84
DOI:
B
Abstract
(
1638
)
PDF
(327KB) (
1188
)
Selection of Reinforcement Options for Prestressed
Concrete Ttype Rigid Frame Box Girder Bridges
ZHOU Dong-Lei, CAO Zheng-Chi, JIAO Wei
2006, 26(5): 85-87
DOI:
B
Abstract
(
1572
)
PDF
(347KB) (
973
)
Rapid Construction Technology for Excavated
Belled Piles in Bridge Construction
SHE Gong-Bin
2006, 26(5): 88-90
DOI:
B
Abstract
(
1579
)
PDF
(380KB) (
1374
)
Survival of the Fittest: Importance of Studying and Accepting Foreign
Technical Standards/Specifications for Chinese Contractors
XUE Hua
2006, 26(5): 91-93
DOI:
C
Abstract
(
1286
)
PDF
(323KB) (
1205
)
Speeding up Transformation of Human Resources into Human Capital
and Doing a Good Job in Development of Enterprise's Human Resources
ZHOU Su-Gong
2006, 26(5): 94-96
DOI:
C
Abstract
(
1236
)
PDF
(335KB) (
861
)
Risk Management of Metro Works Constructed by Method of
Undercutting under Shallow Overburden
WANG Zhen-Fei
2006, 26(5): 97-100
DOI:
C
Abstract
(
1969
)
PDF
(578KB) (
1026
)
Basic Principles and Methods for Calculations of Cost Claims in Construction
GAO Li-Jun
2006, 26(5): 100-103
DOI:
C
Abstract
(
1554
)
PDF
(296KB) (
761
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat