Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2007, 27 (增刊) Published: 10 August 2007
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Discussion on New Austria Tunneling Method
in Tunnel Constructions
GUO Shan-Yun
2007, 27(增刊): 1-4
DOI:
A
Abstract
(
3611
)
PDF
(755KB) (
1097
)
Study on Stability and Design Optimization of
Large underground Caverns in HighStress Areas
SHU Wei-Shen, Duo-Bin, ZHANG Xin, LI Shu-Cai, WANG Gang
2007, 27(增刊): 5-8
DOI:
A
Abstract
(
1529
)
PDF
(1716KB) (
936
)
Disaster Prevention of the Urban Shield Tunnel Engineering
GAO Zong-Zheng, LIU Cheng-Fa
2007, 27(增刊): 9-15
DOI:
B
Abstract
(
1701
)
PDF
(3572KB) (
890
)
Analysis of Stability at Tunnel Entrance |
Due to Different Excavation Methods
JIANG Shu-Bing, LI Jian-Jun, XIE Feng
2007, 27(增刊): 16-20
DOI:
A
Abstract
(
1910
)
PDF
(3227KB) (
657
)
Research on Survey Effects of Faults and
Karst Caves Using LandSonar in Tunnel Construction
ZHONG Shi-Hang, SUN Hong-Zhi, WANG Rong
2007, 27(增刊): 21-25
DOI:
B
Abstract
(
2049
)
PDF
(4796KB) (
732
)
Construction Interaction among Parallel Adjacent Subsea Tunnels
WEI Li-Yuan, LI Shu-Cai, XU Bang-Shu
2007, 27(增刊): 26-29
DOI:
A
Abstract
(
1742
)
PDF
(1697KB) (
782
)
Analysis of Pipesoil Interaction of Pipejacking
SHOU Ke-Jian, Ya-Jun-Hang
2007, 27(增刊): 30-35
DOI:
A
Abstract
(
1683
)
PDF
(2229KB) (
842
)
OneDimensional Numerical Flow Model of Pressure Waves
Induced by Passage of HighSpeed Trains in a Tunnel
MEI Yuan-Gui
2007, 27(增刊): 36-40
DOI:
A
Abstract
(
1898
)
PDF
(935KB) (
823
)
Roof Separation Characteristics of Longwall
Roadway Under Horizontal Stress
LIU Ting-Kan, LIU Yu-Zhou, CHENG Li-Chao
2007, 27(增刊): 41-47
DOI:
A
Abstract
(
1713
)
PDF
(3326KB) (
714
)
The Study of the Urban Track Transportation Noise Prevention at Taipei
Zhang-Kuan-Yong, ZHANG Sai, HU Dun-Yi, YA Bang-Jie, LI Yu-Ying, WEI Wen-Juan
2007, 27(增刊): 48-52
DOI:
B
Abstract
(
1565
)
PDF
(1139KB) (
1032
)
Research on Geological Factors of Surrounding
Rock Deformation of A LargeSection Road Tunnel
YANG Hui-Jun
2007, 27(增刊): 53-59
DOI:
A
Abstract
(
1806
)
PDF
(2756KB) (
701
)
Analysis on Stability of Subsea Tunnel in Faultrupture Zone
WANG Zai-Quan, Wang-Jian-Xin, Zheng-Ying-Ren, Zhang-Li-Meng
2007, 27(增刊): 60-63
DOI:
A
Abstract
(
1837
)
PDF
(692KB) (
828
)
The Study of Tunnel Excavation for Unconsolidated Sandstone
with Laminated Mudstone Demolition Model in the Gravel Deposits Layer
ZHENG Guang-Tan, Guo-Wu-Feng
2007, 27(增刊): 64-69
DOI:
A
Abstract
(
1579
)
PDF
(2759KB) (
996
)
Research on Numerical Simulation of
Aerodynamics Effect in English Channel Tunnel
DIAO Jun, MEI Yuan-Gui
2007, 27(增刊): 70-75
DOI:
A
Abstract
(
1909
)
PDF
(1123KB) (
714
)
Numerical Simulation of TripleMedia Coupling Seepage
YANG Hui-Jun, SUN Ji-Zhu
2007, 27(增刊): 76-79
DOI:
A
Abstract
(
1893
)
PDF
(1657KB) (
888
)
Analysis on Collapse and Damage for Tunnels in Loess Layer
ZHANG Jin-Zhu, Hao-Wen-An
2007, 27(增刊): 80-86
DOI:
B
Abstract
(
1744
)
PDF
(686KB) (
726
)
Exceptional Phenomena on Tunnel Linings in Taiwan
WANG Tai-Dian, HUANG Can-Hui, ZHENG Fu-Shu, XUE Wen-Cheng, FU Zi-Ren
2007, 27(增刊): 87-92
DOI:
B
Abstract
(
1985
)
PDF
(266KB) (
793
)
Study on Standard for Assessing Effects on Structures of Metro Line 2
Due to Vibrations Induced by Underground Trains on
Diameter Line in Beijing
ZHANG Hou-Gui, LIU Wei-Ning, LIU Wei-Feng, GU Ying-Xuan
2007, 27(增刊): 93-97
DOI:
A
Abstract
(
2107
)
PDF
(1739KB) (
1037
)
On the Actual Condition and the Evaluation Method of Ground
Improvement by Jet Grouting
SAN Jing-Long, Zheng-Guo-Xiong, Ji-Wu-Yong
2007, 27(增刊): 98-103
DOI:
B
Abstract
(
1659
)
PDF
(2357KB) (
750
)
Study on Classification Standard
of FrostHeave Force for Tunnels in Frozen Zone
BAI Guo-Quan, CHOU Wen-Ge, ZHANG Dun-Ru
2007, 27(增刊): 104-108
DOI:
A
Abstract
(
1992
)
PDF
(2223KB) (
630
)
The Deformation Mechanism of Tunnel Intersection
LIU Bu-Shang, CHEN Yao-Zhong
2007, 27(增刊): 109-113
DOI:
A
Abstract
(
1609
)
PDF
(1636KB) (
840
)
Determination of Empirical Coefficients in Numerical Analysis
of Highspeed Passenger Trains in A Tunnel
LIU Yang, MEI Yuan-Gui
2007, 27(增刊): 114-116
DOI:
A
Abstract
(
1643
)
PDF
(424KB) (
843
)
Study on Control of Aerodynamic Effect in a Tunnel of Highspeed Railway
CHANG Xiang, ZHANG Xian-Wei
2007, 27(增刊): 117-120
DOI:
B
Abstract
(
2010
)
PDF
(669KB) (
1468
)
Evaluation and Countermeasures for the Joints and Tunnel Structure
of Taiwan’s Undersea Immersed Tunnel
ZHOU Yong-Chuan, ZHANG Jia-Xin, LI Shun-Min, ZHONG Yang-Feng, ZHENG Zhi-Wen
2007, 27(增刊): 121-126
DOI:
A
Abstract
(
1994
)
PDF
(1891KB) (
927
)
Study on Stability of High Portal Slopes and Seismic Responses of
Loess Tunnels on Zhengzhou~Xi’an Passengerdedicated Railway
ZHANG Jin-Zhu, HAO Wen-An
2007, 27(增刊): 127-133
DOI:
A
Abstract
(
2041
)
PDF
(3149KB) (
769
)
Loading Effects on Rock Shed by ThreeDimensional Rockfall Simulation
LUO Jia-Meng, LIN Ming-Lang, ZHENG Fu-Shu, LI Hong-Hui, LI Guo-Cheng
2007, 27(增刊): 134-139
DOI:
B
Abstract
(
2204
)
PDF
(2163KB) (
882
)
The Study on the Critical Acceleration of BlockSliding Induced by Seismic Excitation
ZHENG Fu-Shu, LI Guo-Cheng, HUANG Can-Hui, LIN Ming-Lang, LI Hong-Hui, LUO Jia-Meng
2007, 27(增刊): 140-143
DOI:
A
Abstract
(
1461
)
PDF
(1260KB) (
1162
)
Study on the Monitoring Model of Tunnel Displacement Space Vector
HUANG Ming, LIU Dun
2007, 27(增刊): 144-146
DOI:
A
Abstract
(
1564
)
PDF
(452KB) (
866
)
Study on Structural Types of Shield Tunnels under
Yellow River Subjected to High Internal Water Pressure
ZHANG Chuan-Jian, LV Guo-Liang
2007, 27(增刊): 147-149
DOI:
A
Abstract
(
1649
)
PDF
(483KB) (
727
)
Studies of the Influence of Pilot Tunnel Due to Bypass Tunneling
CHEN Zhi-Na, GU Ru-Long, LAI Zheng-Shu, KE Zhi-Jing
2007, 27(增刊): 150-154
DOI:
A
Abstract
(
1946
)
PDF
(1271KB) (
916
)
Experimental Study on Aerodynamic Model of
Highspeed Train Inout A Overseas Tunnel
LI Gang, MEI Yuan-Gui
2007, 27(增刊): 155-157
DOI:
B
Abstract
(
1732
)
PDF
(729KB) (
780
)
Comparison of Ground Settlement Prediction
due to Shield Tunnel Excavation
CHEN Zhuo-Ran, Chen-Fu-Qing
2007, 27(增刊): 158-162
DOI:
B
Abstract
(
1856
)
PDF
(1133KB) (
764
)
Study on Durability of BoltRock Combination in a Tunnel
SUN Wen-Bin, YANG Hui-Meng
2007, 27(增刊): 163-165
DOI:
A
Abstract
(
1590
)
PDF
(644KB) (
829
)
Special Design Considerations for Intercity
Roadway Tunnels in a Basin Type Urban District
WANG Jian-Zhi, LIN Zong-Xian, LIN Guo-Chang, JIANG Zheng-Chi
2007, 27(增刊): 166-170
DOI:
B
Abstract
(
1654
)
PDF
(2530KB) (
682
)
Research on Techniques of Ventilation and
Disaster Prevention in Long Tunnels
DIAO Lu-Hua
2007, 27(增刊): 171-173
DOI:
A
Abstract
(
2072
)
PDF
(571KB) (
867
)
Numerical Study of Tunnel Excavation under Interstratified Rock Mass
by Distinct Element Modeling
ZHENG Fu-Shu, Huang-Can-Hui, Li-Hong-Hui, Li-Guo-Cheng
2007, 27(增刊): 174-178
DOI:
A
Abstract
(
1749
)
PDF
(2383KB) (
661
)
Analysis of Coupling Interaction of Primary Support and
Surrounding Rock Based on MohrCoulomb Criterion
LIU Ning, SHU Wei-Shen, XU An-Meng
2007, 27(增刊): 179-182
DOI:
A
Abstract
(
1612
)
PDF
(1045KB) (
908
)
Numerical Simulation of Seepage Effect in intermittent
joint caverns with Interface Model
SUN Ai-Hua, Ma-Gong-Bao, SHU Wei-Shen
2007, 27(增刊): 183-187
DOI:
A
Abstract
(
1674
)
PDF
(1075KB) (
672
)
Application of Limit Analysis Theory in
Calculating Active Soil Pressure of Retaining Wall
CHEN Yu-Jiang, ZHOU Ke-Beng, DENG Gong-Wei, HU Jian-Hua
2007, 27(增刊): 188-191
DOI:
B
Abstract
(
1724
)
PDF
(633KB) (
960
)
A Study on Parameters of Bored Tunnel Lining Design
WANG Qiang-Lin, TAO Ci-Lin
2007, 27(增刊): 192-196
DOI:
A
Abstract
(
1374
)
PDF
(1623KB) (
948
)
Study on Mechanical Experiment of A New Type of
Geotechnical Analogue Material
LI Yong, SHU Wei-Shen, WANG Han-Feng, LI Shu-Cai, ZHANG Jiang-Yong
2007, 27(增刊): 197-200
DOI:
A
Abstract
(
1838
)
PDF
(1737KB) (
453
)
The Design Considerations of DOT Tunneling Technology Apply to
Taiwan Taoyuan International Airport MRT Line
SHU Xu, CHEN Dun-Hong, XU Zhong-Yuan
2007, 27(增刊): 202-207
DOI:
B
Abstract
(
1764
)
PDF
(1943KB) (
519
)
Design of Immersed Tunnel from Luntou to Shengwu Island in Guangzhou
SONG Yi
2007, 27(增刊): 207-212
DOI:
B
Abstract
(
1787
)
PDF
(3275KB) (
581
)
The Case Discussion of Design Variation of the
AKungTien Reservoir Transbasin Diversion
Tunnel Sectionunder the National Highway No.3
YANG Feng-Rong, ZHANG Shi-Xian, CHEN Feng-Shi, TUN Xuan-Zong
2007, 27(增刊): 213-217
DOI:
B
Abstract
(
2194
)
PDF
(1043KB) (
425
)
Technology Progress of Design and Construction of
Road Multiplearch Tunnel in Yunnan Province
LI Zhi-Hou, LEI Hua, CHEN Shu-Hong
2007, 27(增刊): 218-223
DOI:
B
Abstract
(
1838
)
PDF
(2602KB) (
367
)
A Study on Fire Safety Regulation of Railway
Underground Stations
JIAN Xian-Wen, LIN Qiang-Yuan, CHEN Zi-Qing, HU Wen-Qing, LI Wan-Jing, TUN Guan-Yuan
2007, 27(增刊): 224-228
DOI:
B
Abstract
(
2006
)
PDF
(769KB) (
670
)
Design and Construction of Shiziyang Shield Tunnel on Passenger Line
CHEN Kui, HAN E-Li
2007, 27(增刊): 229-232
DOI:
B
Abstract
(
1673
)
PDF
(1384KB) (
547
)
The Introduction of Underground Construction for
"Taiwan TaoYuan Airport Link Transit System"
ZHANG Wen-Cheng, GUO Lin-Yao, HU Ting-Hao, Zhou-Dun-Jian, Chen-Cang-Jiang
2007, 27(增刊): 233-237
DOI:
B
Abstract
(
1939
)
PDF
(2344KB) (
652
)
Design and Construction of Shield Tunnel under
River between Chepinan and Wanshengwei
YANG De-Chun, TANG Qi
2007, 27(增刊): 238-244
DOI:
B
Abstract
(
2129
)
PDF
(2903KB) (
416
)
Study on Reinforcement of Concrete Linings in Tunnels
ZHANG Ji-Zuo, Hong-Tu-Chang, Li-Min-Zheng
2007, 27(增刊): 245-249
DOI:
A
Abstract
(
1691
)
PDF
(729KB) (
534
)
Study on ventilation in Deep Long Tunnels Bored by TBM
on the West Line of SouthtoNorth Water Diversion Project
HONG Xue-Yang, YANG En-Wen, LA Jie-Xiu
2007, 27(增刊): 250-253
DOI:
A
Abstract
(
1773
)
PDF
(678KB) (
454
)
The Study of the Evacuation Propram on Tunnel and Underground Stations:Taipei MRT System
ZHANG Sai, TUN Wen-Juan, ZHANG Kuan-Yong, ZHENG Guo-Xiong, ZHONG Wei-Li, WEI Wen-Juan
2007, 27(增刊): 254-258
DOI:
B
Abstract
(
1951
)
PDF
(1349KB) (
615
)
Structural Design of Shallow Tunnel Crossing under a Road
LI Zhi-Hou, CHEN Shu-Hong
2007, 27(增刊): 259-262
DOI:
B
Abstract
(
1674
)
PDF
(1597KB) (
526
)
Case Study the Invert Abrasion of Hydraulic Tunnel
LI Jia-Han, WANG Tai-Dian, QIN De, LIN Ming-Lang
2007, 27(增刊): 263-267
DOI:
A
Abstract
(
1715
)
PDF
(3164KB) (
643
)
Analysis of Doublearch Tunnel on Metro Backturning Line
YANG De-Chun, TANG Qi
2007, 27(增刊): 268-272
DOI:
A
Abstract
(
1780
)
PDF
(1505KB) (
419
)
Design Considerations for Shield Tunneling inGravel Layer
CHEN Zheng-Xun, HE Tai-Yuan, Chen-Fu-Qing
2007, 27(增刊): 273-277
DOI:
A
Abstract
(
1961
)
PDF
(1670KB) (
808
)
Comparison of Ventilation Schemes for Long Sirenbanao Highway Tunnel
CHEN Guang-Meng, JU Yong-Yan, DAN Zheng-Xiong
2007, 27(增刊): 278-283
DOI:
B
Abstract
(
1826
)
PDF
(801KB) (
422
)
Design and Construction of Shield Tunnel in Kaohsiung M.R.T.
CHEN Dun-Rong, SONG Jia-Lin
2007, 27(增刊): 284-289
DOI:
B
Abstract
(
2038
)
PDF
(2756KB) (
917
)
Design and Construction of Shallow Power Tunnels Connected with Existing Power Ditches
SHEN Qingmeng
2007, 27(增刊): 290-293
DOI:
B
Abstract
(
1688
)
PDF
(2012KB) (
401
)
Study on Rroute Selection and Planning of Tunnel
Underwent Conglomerat in Coastal Highway
WANG Tai-Dian, LIU Shi-Dong, CHEN Li-Hua, LUO Wei, DING Yuan-Zhi
2007, 27(增刊): 294-298
DOI:
A
Abstract
(
1546
)
PDF
(2629KB) (
550
)
Application of |Hydraulic |Model Experiment on
Yiluo River Extralarge Bridge of Luojie |Highway
ZHOU Feng
2007, 27(增刊): 299-301
DOI:
B
Abstract
(
1329
)
PDF
(631KB) (
422
)
Special Design Considerations for Intercity
Roadway Tunnels in a Basin Type Urban District
WANG Jian-Zhi, LIN Zong-Xian, LIN Guo-Chang, JIANG Zheng-Chi
2007, 27(增刊): 302-306
DOI:
B
Abstract
(
1667
)
PDF
(2530KB) (
583
)
Analysis of Design and Construction Techniques of Shield Launching Shaft
YANG De-Chun, TANG Qi
2007, 27(增刊): 307-313
DOI:
B
Abstract
(
1885
)
PDF
(1998KB) (
462
)
Design of Support in Metro Tunnel Undercrossing Trench on City's Road
LIU Gui-Beng
2007, 27(增刊): 314-316
DOI:
B
Abstract
(
1647
)
PDF
(614KB) (
379
)
Development and Application of Fiber Reinforced Shotcrete
in Tunnel and Underground Engineering
LIU Yu-Zhou, LIU Ting-Kan
2007, 27(增刊): 317-320
DOI:
B
Abstract
(
2004
)
PDF
(730KB) (
674
)
Analysis on Collapse and Damage for Tunnels in Loess Layer
ZHANG Jin-Zhu, Hao-Wen-An
2007, 27(增刊): 321-324
DOI:
B
Abstract
(
2155
)
PDF
(686KB) (
393
)
Case Study of Deep Jet Grouting at Taipei City Area:
Example of Taipei Mrt CK570H Lot
SHU Xu, ZHANG Wu-Xun, CHEN Jian-Hong, SONG Yuan-Zheng-De, HU Ting-Hao, LI Rong-Rui
2007, 27(增刊): 325-331
DOI:
B
Abstract
(
1600
)
PDF
(4798KB) (
845
)
Study on Construction Technology of A 3arch Tunnel on
Xiongmaohuandao Link Line in Beijing Metro
YANG Shi-Wu, HAN Tie-Bei
2007, 27(增刊): 332-336
DOI:
B
Abstract
(
1624
)
PDF
(2138KB) (
434
)
Additional Working Faces through the Shaft ofHsuehshan Tunnel
CENG Da-Ren, LI Qing-Zong, HUANG Huai-Ban
2007, 27(增刊): 337-343
DOI:
B
Abstract
(
2089
)
PDF
(3254KB) (
392
)
Application of Digital Photography (CCD) in Geological
Investigations during Tunnel Construction
GAN Hun-Rong, YANG Yi, LI Jian-She
2007, 27(增刊): 344-348
DOI:
B
Abstract
(
1777
)
PDF
(2555KB) (
377
)
Application of Artificial Ground Freezing
Method in underground construction in Shanghai
QIN Yi-Xiong, HU Xiang-Dong, CHANG Xin-Min, XIAO Chao-Yun
2007, 27(增刊): 349-353
DOI:
B
Abstract
(
2130
)
PDF
(3022KB) (
599
)
The Discussion for Bored Tunneling Driving Through the
Retaining Wall Beneath the Existent Subway System
ZHANG Wu-Xun, DAN Rong-Feng, CHENG Dao-Shen
2007, 27(增刊): 354-360
DOI:
B
Abstract
(
1270
)
PDF
(3766KB) (
649
)
Research on Construction Technology for Sublake Tunnel Using Mining Method
XIE Jun-Tai
2007, 27(增刊): 361-364
DOI:
A
Abstract
(
1897
)
PDF
(1933KB) (
746
)
Construction Technique of Deep Launching Shaft of Shield under Difficult Conditions
CHEN Yong-Dong, YANG Liu, CHEN Kai
2007, 27(增刊): 365-371
DOI:
B
Abstract
(
2020
)
PDF
(5032KB) (
664
)
The Analysis for Hydro PressureAnchor Caisson Method
ZHENG Guo-Xiong, LI Chang-Guo, LAI Xu-Meng
2007, 27(增刊): 372-377
DOI:
B
Abstract
(
1545
)
PDF
(2487KB) (
563
)
Application of Shield Machine in Construction of tunnels Crossing Yellow
River on Middle Line of SouthtoNorth Water Diversion Project
YANG En-Wen, HONG Xue-Yang
2007, 27(增刊): 378-381
DOI:
B
Abstract
(
1694
)
PDF
(591KB) (
382
)
Design and Construction of Jingsong Station in Beijing Metro
YANG Guo-Zhu, WANG Hai-Xiang, ZHANG Zhi-Bin
2007, 27(增刊): 382-386
DOI:
B
Abstract
(
1795
)
PDF
(2381KB) (
654
)
A Case Study of Decomposition of Shield Machine
Outside the Ventilation Shaft of Station
NI Die-Kuan, ZHENG Wen-Jie, LAI Xu-Meng
2007, 27(增刊): 387-396
DOI:
B
Abstract
(
1882
)
PDF
(5641KB) (
786
)
Decision for Launching Plan of Long &|Thin Mudshield
with Small Diameter under Different Geological Conditions
XIE Ren-Gen, MA Xiao-Ding
2007, 27(增刊): 397-402
DOI:
B
Abstract
(
1486
)
PDF
(3040KB) (
844
)
The Study of Protection Buildings and the Preventions of
Vibrations and Noises Caused by Bored Tunnel Passing the
Bottom of Structures
CHEN Yi-Geng, LEI Xu-Mei, LIU Meng-De
2007, 27(增刊): 403-406
DOI:
A
Abstract
(
1704
)
PDF
(1747KB) (
206
)
Treatment of Sideward Moving of Lattice Girders of Primary
Reinforcement of Shallowburied Undercut Tunnels
TONG Meng
2007, 27(增刊): 407-409
DOI:
B
Abstract
(
1448
)
PDF
(729KB) (
250
)
Singledirection Ventilation Technology in
Construction of Long Tunnels
WANG Yan-Min, XIAO Yuan-Beng
2007, 27(增刊): 410-413
DOI:
B
Abstract
(
1704
)
PDF
(691KB) (
125
)
The Discussion of the Solutions of Shield Tunnel Shift
YA Qi-Ren, Liu-An-De, Chen-Yi-Quan
2007, 27(增刊): 414-417
DOI:
B
Abstract
(
1782
)
PDF
(1585KB) (
157
)
Transportation during TBM Construction in a
25km Long Tunnel on Passenger Line
WANG Guo-Xi, CHAI Yong-Mo
2007, 27(增刊): 418-423
DOI:
B
Abstract
(
2154
)
PDF
(2109KB) (
309
)
The Case Study of the Influence of the Deep Excavation
of Nearby Buildings on the Tunnel at Taipei MRT Xinzhuang Line
SHU Xu, XIE Yu-Hang, GU Hong-Kun, SUN Guo-Xun
2007, 27(增刊): 424-428
DOI:
B
Abstract
(
1883
)
PDF
(1635KB) (
175
)
Singledirection Ventilation Technology in
Construction of Long Tunnels
WANG Yan-Min, XIAO Yuan-Beng
2007, 27(增刊): 429-432
DOI:
B
Abstract
(
1575
)
PDF
(691KB) (
175
)
Study on Construction Method of Large
Section Tunnels in Upper Soft and Lower Hard Layers
DIAO Zhi-Gang, LI Chun-Jian
2007, 27(增刊): 433-436
DOI:
A
Abstract
(
1606
)
PDF
(1672KB) (
269
)
The Application of Hot Bitumen Grouting for Extreme Inflow
Treatment in Underground Engineering
FU Zi-Ren, XUE Wen-Cheng, CHANG Xin-Min
2007, 27(增刊): 437-441
DOI:
B
Abstract
(
1578
)
PDF
(2198KB) (
237
)
Application of Grouting Tubular Anchoring Bolts in Underground
Works and Slope Treatment Works in Fractured Ground
DI Fei-Fei
2007, 27(增刊): 442-444
DOI:
B
Abstract
(
1713
)
PDF
(532KB) (
143
)
Counter Measures for Diaphragm WallTrench Failure
LI Kuai-Shi, Li-Zheng-An
2007, 27(增刊): 445-449
DOI:
B
Abstract
(
682
)
PDF
(3380KB) (
352
)
Application and Research of Ground Deflection Distribution Control Theory
in the Construction of Largespan Embedded Metro Station
WANG Wen-Zheng, KONG Heng, HUANG Meng-Li
2007, 27(增刊): 450-453
DOI:
B
Abstract
(
2041
)
PDF
(1206KB) (
512
)
Construction Technology of Anchor Cable with Removed Core
FU Chun-Jing
2007, 27(增刊): 454-458
DOI:
B
Abstract
(
1627
)
PDF
(2131KB) (
386
)
Tunnel Ventilation and Fire Preventingfor Kaohsiung Subway
CHEN Dun-Rong, Jiang-Zhao-Xiong
2007, 27(增刊): 459-464
DOI:
B
Abstract
(
1759
)
PDF
(1567KB) (
221
)
Control Measures for Ground Settlement during Station Construction
with TunnelColumn Method
FU Chun-Jing
2007, 27(增刊): 465-470
DOI:
B
Abstract
(
1464
)
PDF
(4436KB) (
256
)
Application of Resin Grouting in Tainwan Tunneling
LIU Hong-Xiang, LIU Qin-Zheng, HUANG Chong-Ren, ZHANG Ji-Zuo
2007, 27(增刊): 471-478
DOI:
B
Abstract
(
729
)
PDF
(4790KB) (
276
)
Settlement Prediction and Countermeasures in
the Construction of Metro Tunnel Underneath Existing Buildings
XIANG Xu, HUANG Yin-Ding
2007, 27(增刊): 479-481
DOI:
B
Abstract
(
1653
)
PDF
(1104KB) (
152
)
Presupport Technology in Tunneling Construction
TAN Jun-Min
2007, 27(增刊): 482-485
DOI:
B
Abstract
(
1633
)
PDF
(709KB) (
260
)
Design and Construction of the Underground
Circle MRTstation in Downtown
CHEN Dun-Rong, HONG Zheng-Feng
2007, 27(增刊): 486-493
DOI:
B
Abstract
(
1435
)
PDF
(4434KB) (
437
)
Application of Artificial Ground Freezing Method in
Construction of Contacted Aisle
WANG Ning, XUE Chao-Jie
2007, 27(增刊): 494-497
DOI:
B
Abstract
(
1839
)
PDF
(841KB) (
286
)
Case Study of Application of Geological
Improvement Hardener to Public Works at Taiwan
KE Wu-De, HE Shi-Cheng, LIANG Jia-Hao, CA Ai-Xin
2007, 27(增刊): 498-502
DOI:
B
Abstract
(
916
)
PDF
(2180KB) (
416
)
Design of Ventilation in Construction of Feiluan Tunnelon A Passenger Railway Line
CHEN Hai-Feng, Lu-Bin-
2007, 27(增刊): 503-507
DOI:
B
Abstract
(
2066
)
PDF
(1103KB) (
332
)
The Different Grouting and Excavation Methods of
Ventilation Shafts in Hsueshan Tunnel
CHEN Zhi-Min, Xie-Yu-Shan
2007, 27(增刊): 508-512
DOI:
B
Abstract
(
2029
)
PDF
(969KB) (
210
)
Ground Reinforcement in the Construction of
Connected Aisle between Metro Tunnels in Soft Soil
WANG Ning, XIE Yi-Min
2007, 27(增刊): 513-517
DOI:
B
Abstract
(
1824
)
PDF
(560KB) (
309
)
Case Study on the Construction of the Kaohsiung MRT Crosspassage
Using the Compressed Air Method
HE Tai-Yuan, GAO Cang-He-Pan, ZHONG Gu-Wu-Pan, MA Wen-Can
2007, 27(增刊): 518-524
DOI:
B
Abstract
(
2031
)
PDF
(5034KB) (
281
)
Study on Construction Methods of Tunnels Embedded in the Loess
ZHANG Dun
2007, 27(增刊): 525-529
DOI:
B
Abstract
(
1640
)
PDF
(1680KB) (
211
)
Cross Passage of Overlapping Shield Tunnel
Achieved by means of RJP and Chemical Grouting
PENG Jian-Zhong, ZHANG Wu-Xun, GAO Zong-Zheng, SHU Dong-Hai, HU Ting-Hao, HUANG Zhi-Dong
2007, 27(增刊): 530-535
DOI:
B
Abstract
(
1859
)
PDF
(4197KB) (
245
)
Preliminary Study on Construction Technology of
Connecting Shield Machines in the Ground
WANG Guo-An
2007, 27(增刊): 536-541
DOI:
B
Abstract
(
1588
)
PDF
(325KB) (
353
)
TBM Method in Taiwan Hsuehshan Main Tunnel
LENG Yao-Dong, Xie-Yu-Shan
2007, 27(增刊): 542-547
DOI:
B
Abstract
(
1923
)
PDF
(1707KB) (
308
)
Control of Differential Settlement Due to Tunnel's Crossing under Gaoliang Bridge
ZHANG Shu-Li, Huang-Meng-Li, Xu-Heng-Guo, Zhang-Feng
2007, 27(增刊): 548-550
DOI:
B
Abstract
(
1615
)
PDF
(1590KB) (
250
)
Construction Technology of Connected Aisle in Subway Tunnel Bored by Shield
WANG Er-Beng, DIAO Guo-Jun
2007, 27(增刊): 551-554
DOI:
B
Abstract
(
1874
)
PDF
(1845KB) (
1081
)
Technical Difficulties and Measures in the Construction of Subway Station Due to Shield Machine's Crossing Station
CHEN Gang, WANG Er-Beng
2007, 27(增刊): 555-558
DOI:
B
Abstract
(
1400
)
PDF
(1238KB) (
630
)
Ground Reinforcement Techniques of LargeScale Underground
Excavation under 2 150 Sewer Pipeline
WANG He-Wang
2007, 27(增刊): 559-562
DOI:
B
Abstract
(
1754
)
PDF
(1607KB) (
223
)
Performance of SelfLeveling Concrete and
Its Application in the Zhanongkou Tunnel
DUAN Xiangwei
2007, 27(增刊): 563-565
DOI:
B
Abstract
(
1443
)
PDF
(685KB) (
496
)
Application of Risk Management on Metro Line No.10 in Shanghai
BAI Yun, SHANG Jing, MAO Jian-Min
2007, 27(增刊): 566-570
DOI:
B
Abstract
(
1814
)
PDF
(2131KB) (
220
)
Emergency and Rescue Strategies Analysis for Hsuehshan Tunnel Fire
JIAN Xian-Wen, SHI Bang-Zhu, XIONG Guang-Hua, HUANG Ba-Da, HUANG Yi-Hui, XIE Hui-Ru
2007, 27(增刊): 571-576
DOI:
A
Abstract
(
2141
)
PDF
(1541KB) (
228
)
The Evaluation of the Airtemperaturen the Syueshan tunnel
LI Hong-Che
2007, 27(增刊): 577-581
DOI:
B
Abstract
(
1699
)
PDF
(1359KB) (
202
)
The Risk Analysis of Underpinning to Pile Foundation
in the Stretch Between Guomao Station and Dajuyuan
Station on Line 1 of Shenzhen Metro
LI Dong-Mei, Chou-Wen-Ge
2007, 27(增刊): 582-585
DOI:
B
Abstract
(
1658
)
PDF
(1235KB) (
202
)
Establishment of Multimedia Database of Landscape at Tunnel Entrances
LIN Er-Ji, Chou-Wen-Ge
2007, 27(增刊): 586-589
DOI:
A
Abstract
(
1738
)
PDF
(1381KB) (
140
)
Management of Significant Risk Sources: Case Study on
Mazhou Subsea Tunnel Project
TUN Fa-Zhan
2007, 27(增刊): 590-592
DOI:
B
Abstract
(
1803
)
PDF
(575KB) (
153
)
Selection of Lift Equipment in Deep and
Large Foundation Pit of Metro Station
YAN Fa-Rong
2007, 27(增刊): 593-595
DOI:
B
Abstract
(
1374
)
PDF
(486KB) (
276
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat