Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (11) Published: 20 November 2013
Previous Issue
Next Issue
Back issue
Analysis on Behavior of Shieldbored Metro Tunnel Caused by Construction of Largescale Foundation Pit Located Above: Case Study on Foundation Pit of West Square Hangzhou East Railway Station
ZHANG Di
2013, 33(11): 897-902
DOI:
10.3973/j.issn.1672-741X.2013.11.001
Abstract
(
2543
)
PDF
(5584KB) (
1022
)
A New Classification Method for Rock Mass of Highway Tunnels Based on GeneticRadial Basis Function Neural Network
ZHOU Xiancang
2013, 33(11): 903-907
DOI:
10.3973/j.issn.1672-741X.2013.11.002
Abstract
(
2321
)
PDF
(653KB) (
734
)
Numerical Analysis on Influence of Construction of Water Conveyance Tunnels Crossing Underneath Existing Wukesong Metro Station
LI Gang
2013, 33(11): 908-913
DOI:
10.3973/j.issn.1672-741X.2013.11.003
Abstract
(
2465
)
PDF
(1087KB) (
851
)
Study on Stability of Mined Metro Tunnel Crossing Underneath Existing Cable Tunnels
CAO Bo, LIU Bo, NIE Weiping
2013, 33(11): 914-920
DOI:
10.3973/j.issn.1672-741X.2013.11.004
Abstract
(
2457
)
PDF
(2120KB) (
818
)
Analysis on Lining Stress of Tunnel with Filled Karst Caves under its Floor
HE Yiwu
2013, 33(11): 921-927
DOI:
10.3973/j.issn.1672-741X.2013.11.005
Abstract
(
1838
)
PDF
(19179KB) (
676
)
Study on Influence of Muck Screening Efficiency on Slurry Property in Slag Slurry Shield Tunneling Circulation System Efficiency on the Influence of Mud
WANG Hai, ZHONG Xiaochun
2013, 33(11): 928-932
DOI:
10.3973/j.issn.1672-741X.2013.11.006
Abstract
(
4252
)
PDF
(797KB) (
1855
)
Mechanical Test and Numerical Analysis of Elastic Gaskets of Shield Tunnels
OUYANG Wenbiao
2013, 33(11): 933-936
DOI:
10.3973/j.issn.1672-741X.2013.11.007
Abstract
(
2645
)
PDF
(1210KB) (
1603
)
Analysis on Antifloating Calculation of Xiangang Metro Station in Guangzhou
LI Guangtao
2013, 33(11): 937-941
DOI:
10.3973/j.issn.1672-741X.2013.11.008
Abstract
(
2297
)
PDF
(1014KB) (
1153
)
Design of No. 1 Shaft of Weihe Tunnel on BaojiLanzhou Passengerdedicated Railway
JI Yanlei
2013, 33(11): 942-948
DOI:
10.3973/j.issn.1672-741X.2013.11.009
Abstract
(
2564
)
PDF
(2009KB) (
865
)
Key Technologies of Slurry Shield Tunneling in Beijing Railway Underground Diameter Line
HE Feng
2013, 33(11): 949-955
DOI:
10.3973/j.issn.1672-741X.2013.11.010
Abstract
(
2739
)
PDF
(4820KB) (
1037
)
Construction Technology for Doubletrack Railway Tunnel Passing underneath Debris Flow Gully with Shallow Cover: Case Study on Yangjiaba Tunnel on LanzhouChongqing Railway
WU Guangming, CUI Xiaopeng
2013, 33(11): 956-959
DOI:
10.3973/j.issn.1672-741X.2013.11.011
Abstract
(
2187
)
PDF
(1945KB) (
1412
)
Case Study on Tail Seal Repairing in Waterrich Sandy Strata
ZHOU Zhaoyong, GONG Xuedong
2013, 33(11): 960-963
DOI:
10.3973/j.issn.1672-741X.2013.11.012
Abstract
(
2725
)
PDF
(961KB) (
1087
)
Hazard and Accident Prevention in Construction of Tunnels in Shanxi Great Water Supply Network Projects
REN Gouping
2013, 33(11): 964-970
DOI:
10.3973/j.issn.1672-741X.2013.11.013
Abstract
(
1620
)
PDF
(720KB) (
810
)
Optimized Design and Application of EPB Shields for Typical Sandy Cobble Ground in China
PU Xiaobo, WANG Mogong, WU Wenbin
2013, 33(11): 971-976
DOI:
10.3973/j.issn.1672-741X.2013.11.014
Abstract
(
1897
)
PDF
(1565KB) (
1118
)
Treatment Measures for Wearing of Main Drive Sealing Slide of EPB Shield
MIAO Nan
2013, 33(11): 977-981
DOI:
10.3973/j.issn.1672-741X.2013.11.015
Abstract
(
3938
)
PDF
(1050KB) (
1072
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat